- 0PGP03-ZX-0002B Station Cause Analysis Program*
- *
What are the CAQ Significance levels?
- Level 1Q (SCAQ):*
- *Condition with major impact warranting investigation.**
Events or occurrences are expected to happen rarely and consequences are serious.
- Level 2Q (CAQ-S):*
- *Condition with moderate impact warranting investigation.**
Events or occurrences are less serious in nature.
- Level 3Q (CAQ-D):*
- *Low level Condition**
Condition may be non-consequential but actions are required to address issue/behavior.
- Level 4Q (CNAQ):*
- *Condition with no or minimal impact.**
Such as low level material deficiencies on NRS components enhancements, non-consequential issues, tracking issues (e.g. condition not adverse to Quality)
- 0PGP03-ZX-0002B Station Cause Analysis Program*
- *
What analysis would you use for a high, medium, or low consequence condition?
- High Consequence:*
- *Root Cause Investigation**
- Medium Consequence:*
- *Apparent Cause Investigation**
Low Consequence:
Human Performance Checklist
Equipment Checklist
Organizational Effectiveness Checklist
- 0PGP03-ZX-0002B Station Cause Analysis Program*
- *
Who owns the CRs for the different CAQ Significance Levels?
- Level 1Q (SCAQ):*
- *≥ Department Manager**
- Level 2Q - 4Q:*
- *Any Level of the organization**
Owners assigned by CR Screening Committee
- 0PGP03-ZX-0002 Condition Reporting Process*
- *
Who is responsible for conducting an Effectiveness Review upon closure of a Condition Report?
Condition Review Group (CRG)
- 0PGP03-ZX-0002 Condition Reporting Process*
- *
What actions required by the Shift Manager upon receipt of a Condition Report?
Determine if it affects OPERABILITY, Reportability, or FUNCTIONALITY
Determine if condition is a MODE restraint
- 0POP01-ZO-0002 345 kV Switchyard*
- *
What must the DQO do if communications are broken off during a hold order?
Read back all the instructions up to the point of breaking communications before continuing with the Hold Order
- 0POP01-ZO-0002 345 kV Switchyard*
- *
Who can be designated as a STP designated qualified operators?
Unit Supervisor
SM
Unit Operations Manager
- 0POP01-ZO-0002 345 kV Switchyard*
- *
What is a hold tag?
- *Used to designate the correct state for circuit isolation**
- Do not operate with authorization from CNP transmission RTO*
- 0POP01-ZO-0002 345 kV Switchyard*
- *
If a switching order affects Unit 1 and Unit 2, who coordinates the switching order?
Unit 1
Note:
Switching Order: Order given by CNP transmission RTO to open/close breakers owned by the transmission service provider
- 0POP01-ZO-0002 345 kV Switchyard*
- *
Who has operational jurisdiction over all the 345 kV equipment?
Centerpoint Energy
Note:
The plant owns the MSU Xfmr disconnects and standby XFMR disconnects.
- 0PGP03-ZO-0039 Configuration Management*
- *
If a computer point was taken off scan, removed from alarm checking, or a substitute value entered, the computer point must be tracked in the points off scan log. When must the review be performed?
36 hrs
If another point is available, then review can be extended to 72 hrs.
- 0PGP03-ZO-0039 Configuration Management*
- *
Who coordinates the computer point off scan review?
Engineering Duty Manager
- 0PGP03-ZO-0039 Configuration Management*
- *
If the Plant Computer User Defined Alarm is used to monitor and trend a parameter, is tracking the parameter still required?
No
- 0PGP03-ZO-0039 Configuration Management*
- *
If the information is contained in another document, drawing, OR an approved procedure, can an operator aid be used?
No
- 0PGP03-ZO-0039 Configuration Management*
- *
How often is the operator aid review performed?
Quarterly
Performed by issuing authority.
Note:
The continuing need for each Operator Aid does not need to be verified. (kinda strange)
0PGP03-ZA-0140 Plant Status Control
What is the definition of plant status control?
The precise and deliberate control of plant components and configurations that maintains every plant system in a required and known configuration providing safe and reliable control of the plant.
- 0PGP03-ZO-EC01 Equipment Clearance Orders*
- *
What dose would classify a task as having significant radiation exposure?
≥ 10 mrem
- 0PGP03-ZO-EC01 Equipment Clearance Orders*
- *
Who can be a technical reviewer?
SRO w/ NRC License
SRO w/ Certification for STP
Qualified Individual designated by OPS management
- 0PGP03-ZO-EC02 Lockout / Tagout Program*
- *
Is the use of human danger tags authorized?
No
- 0PGP03-ZO-EC02 Lockout / Tagout Program*
- *
Whose permission is required to use a check valve, relief valve, or a fail open valve as a tagout boundary?
Unit Operations Manager
Maintenance Division Manager / General Maintenance Supervisor
Also need their approval if:
- Working on system > 140 ˚F without a system vent/drain.
- Using a freeze seal
- Working on flange adjacent to boundary valve
- Any backseated valve used for single valve isolation
- 0PGP03-ZO-EC01 Equipment Clearance Orders*
- *
Who can waive the IV on an ECO restoration?
- *Issuing Authority**
- Unit Operations Division Manager (Designee) must concur*
IV waived for significant radiation exposure, personnel safety reduction, or for emergency conditions.
Note:
IV on locked components cannot be waived
- 0PGP03-ZO-EC01 Equipment Clearance Orders*
- *
What kind of verification is used for installing / removing grounding devices?
Dual Verification
Cannot be waived.
Note:
Opening disconnects and removing/installing fuses also require dual verification.
- 0PGP03-ZO-EC02 Lockout / Tagout Program*
- *
What requires double valve isolation?
- *Fluid systems > 150 psig or > 200 ˚F**
- Hazardous System*
SFP Discharge Piping
Systems containing radioactive fluids
Systems containing chemically hazardous fluids
- 0PGP03-ZO-EC01 Equipment Clearance Orders*
- *
What is a severity Level 1, Level 2, and Level 3 event?
- Level 1:*
- *Discovered after work has started**
- Level 2:*
- *Discovered after ECO released**
- Level 3:*
- *Discovered before ECO released**
To classify for these events, the error discovered potentially or could potentially expose a worker to hazardous energy.
- 0PGP03-ZO-EC02 Lockout / Tagout Program*
- *
What is the proper sequence for removing a motor driven pump from service?
Electrically isolate motor
Close pump discharge
Close pump recirc.
Close pump suction
- 0PGP03-ZO-EC01 Equipment Clearance Orders*
- *
Who has authority to resolve clearance book interface jurisdictional conflicts?
Unit 1 Shift Manager
- 0PGP03-ZO-EC01 Equipment Clearance Orders*
- *
If a backseated MOV must change positions in order to perform its intended safety function, the Unit Supervisor is required to do what?
Declare MOV inoperable until operation verified
Make appropriate log entries
- 0PGP03-ZO-EC01 Equipment Clearance Orders*
- *
If during an emergency, the Issuing Authority wishes to release an ECO, and both the Acceptor and his immediate supervisor can not be notified. Who can release the ECO?
- *Issuing Authority**
- Written notification must be attached to each acceptor’s security badge.*
Security will stop each acceptor next time they enter site to tell them what happened.
- 0PGP03-ZO-EC01 Equipment Clearance Orders*
- *
What is the definition of an emergency?
Significant hazard to personnel
Significant equipment damage
Failure to comply with a Technical Specifications Action Statement.
Degradation of ESF
Further escape of effluents.
- *SM Discretion**
- May Deviate from Procedure*
- 0POP01-ZA-0001 Admin Guidelines*
- *
When is the locked component deviation log audited?
Monthly
- Note:*
- Shift Manger/Unit Supervisor responsible for ensuring log updated when locked valve positioned.*
- 0POP01-ZA-0001 Admin Guidelines*
- *
When are the emergency operations lockers audited?
Quarterly
- 0POP01-ZA-0001 Admin Guidelines*
- *
While checking the position of a normally locked closed valve, the valve operator cannot be moved due to the locking device. What is the proper method for checking the position of this valve?
Remove the locking device
Check valve in closed direction
- 0POP01-ZA-0001 Admin Guidelines*
- *
When is Independent Verification NOT required?
Changing position does not render component incapable of performing it’s safety function
- 0POP01-ZA-0001 Admin Guidelines*
- *
How is a locked throttle valve’s position verified?
Visual Observation
Local Indicators
SM’s permission required to move locked throttle valve.
- 0POP01-ZA-0001 Admin Guidelines*
- *
When are valves in the AFWST pit required to be checked?
If security barrier is breached
- 0POP01-ZA-0001 Admin Guidelines*
- *
Following an outage, whose permission is needed to waive the initial valve lineup for a system?
Unit’s Operation Manager
One of the following conditions must exist:
- System has remained in service
- No work performed on system and system not modified
- If work performed, then process was controlled by ECO process
Note:
Valves in MAB pit rooms not required to be checked for initial valve lineups