remote shutdown Flashcards

1
Q

What range for reactor water level is indicated from the remote shutdown panel?

A

-160” to 140”

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What does the P152 panel do?

A

Has “lockout transfer relay” switch to transfer control from control room to Alternate shutdown panels. It disables the Control Room from DIV 1 components

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

When the P152 panel is taken to ON, will auto initiations still function?

A

Not for div 1

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What’s the purpose of the enable/disable switch at the remote shutdown panel?

A

bypass the 476/450 psig interlock for low pressure injection valves

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

What’s the purpose of the Remote Shutdown system?

A

Provides ability to shutdown reactor outside of main control room

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

What’s the purpose of the Alternate shutdown system?

A

Provides electrical isolation from the control room circuitry in the event of a fire

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What can be controlled from P150?

A
  1. SSW A
  2. RCIC
  3. CRD pump A
  4. RHR A
    a. SDC
    b. Suppression pool cooling
    c. LPCI mode
    d. Reject to radwaste mode
  5. 6 SRVs Div 1 A solenoids
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

What are the 2 remote shutdown panels and which ones go to which division?

A

P150 - Div 1

P151 - Div 2

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

What should be disabled before using the remote shutdown panels?

A

CO2 system for Div 1, 2, and 3 switchgear rooms

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

What can be controlled from P151 panel?

A
  1. SSW B
  2. CRD B
  3. RHR B
    a. Suppression pool cooling
    b. SDC
    c. LPCI mode
    d. Reject to radwaste
    e. CTMT to flood mode
  4. 6-SRVs DIV 2 “B” solenoids
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

What division does the alternate shutdown panels control?

A

Div 1

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

IF both “A” and “B” solenoids are disabled, how will they operate?

A

Safety only!

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

What happens to the interlocks when using the remote shutdown panel?

A

There are no interlocks

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

When Norm/Emergency switch is placed in EMERGENCY, does the control room have control or indication?

A

NO

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

If SRV’s handswitch is placed in OFF, on one panel (P150 or P151), will the valves still operate properly?

A

Yes using only signals from the other division

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

What happens if SRV handswitch is taken open with no other actions?

A

valve will open!

17
Q

What isolation signals can be reset form Remote shutdown panels?

A

Group 1 and group 2

18
Q

Which panels reset which division isolations?

A

P150 - Div 1

P151 - Div 2

19
Q

What does the red light indication mean for SRVs on remote shutdown panel?

A

Solenoid is energized.