PM cards 14th 20 Flashcards
Changes to project scope always require changes to the __________.
project schedule
___________ monitors the project deliverables against the project requirements and the quality baseline to ensure that the project is delivering according to plan.
Quality control
Quality Control monitors the project ___________ against the project ____________ and the quality baseline to ensure that the project is delivering according to plan.
deliverables, requirements
___________ monitors the expenses on the project and assures costs stay in alignment with the performance baseline.
Cost control
What is quality control?
The process of reviewing project results and determining whether they comply with the standards documented in the quality management plan and making any appropriate changes to remove the causes of unacceptable quality when the standards are not met.
What is inspection?
a Quality Control tool that involves examining, measuring, or testing work results to determine whether they conform to the quality standards and plan.
Some of the costs associated with inspection include ?
rework, labor costs, material costs, and potential loss of customers.
What are tolerable results?
When measurements fall within a specified range during quality control inspection.
What is attribute sampling?
A quality control inspection technique which determines whether the results are conforming or nonconforming to the requirements.
What is prevention in regard to quality control?
Prevention keeps errors from reaching the customers or from occurring in the first place.
What is a Pareto diagram?
It is used to rank the importance of a problem based on its frequency of occurrence over time.
What type of histogram displays the relative importance of defects?
Pareto diagram
What is a histogram?
Abar chart that depicts variables on the horizontal and vertical axes.
What are control charts?
Masure and display the variance of several samples of the same process over time.
What type of technique is commonly used in quality control testing of manufacturing?
Control Chart