NSTM 079 - Practical Damage Control Flashcards
What are the three tiers of response to Damage Control Conditions of Readiness?
Flying Squad, Condition II DC, General Quarters
This team is the first response at Condition III
Flying Squad
This team is the first responders while inport
Flying Squad
While the ship is inport, the Flying Squad is backed up by which team?
Import Emergency Team
What is the primary purpose of the Flying Squad?
Respond to casualties and determine extent of damage
Who are the three members of the Rapid Response team?
Fire Marshall, Electrician, Rapid Responders
This condition allows DC response without disrupting tactical watch stations
Condition II DC
Storage spaces are designated with what letter?
A
C2 spaces are designated with what letter?
C
Engineering spaces are designated with what letter?
E
HAZMAT spaces are designated with what letter?
K
Ammunition spaces are designated with what letter?
M
What are the 3 basic material conditions of readiness?
X-Ray, Yoke, Zebra
What condition of readiness is used inport?
X-Ray
What condition of readiness is used while underway?
Yoke
What condition of readiness is used during GQ?
Zebra
What condition allows for fitting to be opened without special permission of access spaces?
Circle X-Ray or Circle Yoke
What fittings are closed during darken ship conditions?
Dog Zebra
Ventilation fittings are marked with what classification?
William
How is the main drainage system segregated and how are they classified?
By bulkhead stop valves, classified as Circle X-Ray
What type of drainage is utilized in compartments above the waterline?
Gravity drains
Where are most gravity drains discharged to?
Over the side through scuppers
How are portable pumps discharged?
Overboard discharge connections, which have screw caps (not valves), and use a 4 inch pipe
What device must be used when pumping combustible liquids?
Must use eductors, and use a non-contaminated water source