What are Light-Off Orders?

A

Used by the Engineer to issue specific instructions and timelines for bringing the plant into operation

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Who must sign all Light-Off Orders?

A

Engineer and CO

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

List 4 items that must be included in the Engineer’s 8 O’Clock Reports.

A
  1. Plant Lineup
  2. Casualties/degradations and detailed info
  3. Additional Remarks
  4. Fresh/Feed Water Percentages
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

With respect to equipment light off, what three items require CO permission?

A
  1. Prior to starting Light-Off Procedures
  2. Major change to plant lineup
  3. Safety observer other than EOOW to observe boiler light off
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

When may Battle Override be utilized?

A

With CO express permission, or when stated in Battle Orders

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Who must grant permission to deviate from EOSS?

A

CO, but may be through standing orders, RMD, or Battle Orders

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Whose permission is required to ballast/deballast?

A

CO

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Whose permission is required to begin on or off load of fuels/lube oils?

A

CO

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

What two permissions are needed to enter a tank/void?

A

CO must grant, and Gas-Free certification is required

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Who may authorize single-valve protection?

A

CO

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Who may authorize placing alarms in cut-out?

A

CO

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Who may authorize setting RMD?

A

CO, or OOD in his stead iaw Standing Orders

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Who is the final approval for EOOW qualification?

A

CO

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

Who is the final approval for all Engineering qualifications, with the exception of the EOOW?

A

Engineering Officer

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

What is the maximum allowed length of watch allowed in Engineering without the express permission of CHENG?

A

six hours

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

List 4 items that are required to be locked in engineering spaces.

A
  1. MRG access covers
  2. SSDG/Emergency Generator reduction gear covers
  3. Boiler safety valves
  4. Gas Turbine Module doors when space is not manned (i.e. inport)
17
Q

In the event of a security breach of locking devices, when may operations resume?

A

Following a thorough investigation and permission of the CO

18
Q

What is the max amount of flammable liquid leaks that are deemed acceptable?

A

None

19
Q

What is the max amount of lube and hydraullic oil leaks that are deemed acceptable?

A

So that it does not pool on machinery