Module 6.1 Knowledge Questions Flashcards

1
Q

The let by test is carried out at a pressure of…

a) 10 inches water gauge
b) 10 bar
c) 10 pascals
d) 10 millibar

A

d) 10 millibar

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

The gas/air mixture being purged from a domestic installation needs to be lit when the installation volume exceeds….

a) 0.01m3
b) 0.35m3
c) 0.071ft3
d) 0.02m3

A

d) 0.02m3

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

The maximum permissible tightness test pressure loss for a U6 meter fitted to an existing installation with max 28mm pipework and appliances connected is….

a) 1 mbar
b) 2.5 mbar
c) 4 mbar
d) 8 mbar

A

c) 4 mbar

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

After a successful let-by test the pressure should be slowly raised to….

a) 10 mbar
b) 20 mbar
c) 21 mbar
d) 23 mbar

A

b) 20 mbar

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

When designing a gas installation the maximum allowable pressure drop between the meter and any appliance is…

a) 5 mbar
b) 2 mbar
c) 1 mbar
d) 1 bar

A

c) 1 mbar

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

The IGE publication covering tightness testing of gas installations with pipework limited up to 35mm copper or DN32 steel; a volume not exceeding 0.035m3 and with a maximum rating of 16m3/hr is…

a) IGE/UP/7
b) IGE/UP/8
c) IGE/UP/1A
d) IGE/UP/1B

A

d) IGE/UP/1B

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

The gas meter that has a badged capacity of 0.035 ft3 is…

a) E6
b) U6
c) U16
d) G10

A

b) U6

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

The installation volume (IV) of a system fitted with a U6 gas meter, 10m of 35mm copper, 5m of 22mm copper pipework and a further 5m of 15mm copper would be…

a) 0.04997m3
b) 0.03252m3
c) 0.02684m3
d) 0.01977m3

A

d) 0.01977m3

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

The Purge Volume of an installation fitted with a U6 gas meter, 10m of 35mm copper, 5m of 22mm copper and a further 5m of 15mm copper is….

a) 0.04987m3
b) 0.027655m3
c) 0.03684m3
d) 0.01477m3

A

b) 0.027655m3

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

After a successful tightness test a smell of gas persists. The correct action would be…..

a) To repeat the tightness test over 5 minutes
b) To contact CORGI
c) To contact the ESP
d) To do nothing as the installation is OK

A

c) To contact the ESP

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

What is the time period that must be allowed for a domestic tightness test?

a 1 minute.
b 2 minutes.
c 3 minutes.
d 4 minutes.

A

b 2 minutes.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Prior to the domestic tightness test, 1 minute is allowed to check for the meter control passing gas. It this test was not carried out, the consequences could be:

a Gas may be escaping through the inlet supply.
b The gas pressure could rise within the meter.
c Gas that is escaping could be replaced from the supply.
d Gas escaping from the service would be recorded.

A

c Gas that is escaping could be replaced from the supply.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

What equipment must be used to pin point the source of a gas escape?

a A U tube manometer.
b An electronic gas detector.
c Diluted washing up liquid.
d Leak detector solution.

A

d Leak detector solution.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

When testing a new installation with air prior to the installation of a gas supply, it is not necessary to allow 1 minute for stabilization:

a. True.
b. False.

A

b. False.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

If, when carrying out a tightness test, the readings on each side of a U gauge are 16mbar and 20mbar, the pressure at which the test is being carried out is:

a 16mbar.
b 20mbar.
c 18mbar.
d 36mbar.

A

c 18mbar.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

The permissible leakage rate tor a new gas installation is:

a 0mbar.
b 1mbar.
c 2mbar.
d 4mbar.

A

a 0mbar.

17
Q

It during the initial stages of a tightness test the meter control should be found to be passing gas, what must the gas operative do?

Answer…….

A

Turn off the gas emergency/meter control and contact the gas supplier/transporter