Module 1 - Planning, Development & Organization Flashcards
11% of Exam - Approx. 20 questions
When to use Narrative specs format?
at Design Concept and Schematic Design - describes major materials and systems
When to use Preliminary Project Descriptions specs format?
at Schematic Design - type of performance specifying, defines requirements/results, common for Design-Build projects
When to use Outline specs format?
at Design Development - describes basic product and material requirements
When to use Shortform spec format?
at Design Development and Construction Documentation - for limited scope, less detailed descriptions, when lacking comprehensive info, format for sheet specs
When to use Full Length spec format?
at Design Development and Construction Documentation - larger, more complexity, use when high liability risk
What is Purchasing Specifying?
When the work is limited to the delivery of goods, no construction or installation
What steps are taken to coordinate spec production schedule with key stakeholders?
Include time to review comments after each design submittal (owner and AHJ), share format, schedule and delivery dates with consultants
What methods are there for documenting production schedule?
Gantt Method - bar chart
Critical Path Method (CPM) - identify long lead times and milestone dates
What are the methods for assembling and recording project info?
- Compiled project notes
- Communication log of emails
- Project notebook, folders by divisions
- Checklists
What are the methods of documenting questions/requests/changes at procurement?
- Email, written communication
- CSI Form 7.0A “Comm. Record”
- CSI Form 7.0B “Comm. Log”
- Firm specific forms
- Online collaboration, PM applications
What format should responses to questions/requests/changes be?
WRITTEN FORM
What are the common types of project manual modifications?
- Addenda (before bidding)
- Substitution requests
- Contract modifications
- Requests for information (RFI)
What forms or logs are used to document and track substitution requests?
- General requirements in Div 01
- CSI Form 1.5C “Sub request during bidding”
- CSI Form 13.1A “Sub request after bidding”
- CSI Form 13.1B “Sub request log”
What are the common revision identifiers in specifications?
- Revision numbers
- Delta symbols (triangle)
- Clouds
- Text: strikethrough, bold, italic, underline
What is the Narrative method for issuing revisions?
Modifications are described in writing. Brief, clear, and cross reference repetitive changes