M13520.1C Flashcards
The survival shop/inflatable equipment inspection and maintenance area shall be large enough to service what?
The largest inflatable item, as well as the greatest number of inflatable items per set
2-2
The inflatable packing and inspection tables shall be large enough to accommodate what
The entire set being tested and permit a maintenance work area for each unit
2-2
The inflatable table shall have what
A smooth surface and be totally free of sharp edges, points, burrs, or slivers
2-2
Decks where rafts are serviced, tested, and maintained shall be covered with what
Linoleum, asphalt tile, polished terrazzo stone, tile, or a similar smooth, padded(rubber), clean surface
2-2
What type of lighting shall be in the inflatable room
Recessed or shrouded fluorescent lighting
2-2
How shall Windows be fitted
With protective blinds or drapes to exclude extended sunlight exposure periods which degrade synthetics and poly bonded fabrics
2-2
What shall the temperature and humidity of the inflatables room be regulated to
Temperature: 65 F-75 F
Humidity: 40-60%
2-2
What is the ideal method of controlling temperature and humidity for the inflatable shop
Air conditioning system
2-2
What shall shop air be regulated to
40 psig
The air source will be filtered to ensure no oil or moisture is present
2-2
What air quality specifications are mandatory for the SEAS-1
- CGA modified grade E
- Oxygen 20-22%
- Carbon dioxide 500 PPM
- Carbon monoxide 10 PPM
- Methane (CH4) 25 PPM
- Water vapor 67 PPM
- Dew point- 50 F
- Odor- none
2-2, 2-3
What are air stations required to test their air compressor supply and quality with
DCAT- Defense Compressed Air Testing
2-3
What shall shop air pressure be capable of achieving
100 psig
2-3
What types of surfaces are inflatables not allowed to be inspected on
Carpet, asphalt, concrete, hardwood, or wood decks where nails splinters lime grit, or pebbles may damage the inflatable
2-1 Caution
Who is authorized to make equipment configuration changes, deletions, or replacements
ALC ALSE Systems manager and this is submitted by the AST via the applicable chain of command
1-1
Who sets the operational requirements for ALSE
CG-711
1-1