M13520.1C Flashcards
The survival shop/inflatable equipment inspection and maintenance area shall be large enough to service what?
The largest inflatable item, as well as the greatest number of inflatable items per set
2-2
The inflatable packing and inspection tables shall be large enough to accommodate what
The entire set being tested and permit a maintenance work area for each unit
2-2
The inflatable table shall have what
A smooth surface and be totally free of sharp edges, points, burrs, or slivers
2-2
Decks where rafts are serviced, tested, and maintained shall be covered with what
Linoleum, asphalt tile, polished terrazzo stone, tile, or a similar smooth, padded(rubber), clean surface
2-2
What type of lighting shall be in the inflatable room
Recessed or shrouded fluorescent lighting
2-2
How shall Windows be fitted
With protective blinds or drapes to exclude extended sunlight exposure periods which degrade synthetics and poly bonded fabrics
2-2
What shall the temperature and humidity of the inflatables room be regulated to
Temperature: 65 F-75 F
Humidity: 40-60%
2-2
What is the ideal method of controlling temperature and humidity for the inflatable shop
Air conditioning system
2-2
What shall shop air be regulated to
40 psig
The air source will be filtered to ensure no oil or moisture is present
2-2
What air quality specifications are mandatory for the SEAS-1
- CGA modified grade E
- Oxygen 20-22%
- Carbon dioxide 500 PPM
- Carbon monoxide 10 PPM
- Methane (CH4) 25 PPM
- Water vapor 67 PPM
- Dew point- 50 F
- Odor- none
2-2, 2-3
What are air stations required to test their air compressor supply and quality with
DCAT- Defense Compressed Air Testing
2-3
What shall shop air pressure be capable of achieving
100 psig
2-3
What types of surfaces are inflatables not allowed to be inspected on
Carpet, asphalt, concrete, hardwood, or wood decks where nails splinters lime grit, or pebbles may damage the inflatable
2-1 Caution
Who is authorized to make equipment configuration changes, deletions, or replacements
ALC ALSE Systems manager and this is submitted by the AST via the applicable chain of command
1-1
Who sets the operational requirements for ALSE
CG-711
1-1
Who acts as the project manager for new ASLE acquisitions and manages in service ALSE
ALC Technical Services
1-1
Who is responsible for technical responsiveness to field level ALSE maintenance managers and is first point of contact
ALSE Prime
1-1
Where can a detailed description of the structure of the ALSE organization be found
M13020.1
Aeronautical Engineering Maintenance Management Manual
1-1
Who is the Aviation Life Support Equipment Systems manager
CG-41
1-1
Who is the ALSE product line manager
ALC ALSE Technical Services
1-1
What manual is to furnish its users with an up to date single source of technical information concerning aviation life support systems and rescue equipment in use by coast guard aviation
M13520.1C
1-1
What process guide assimilates CG, Air Force, and navy aviation life support systems
CGTO PG-85-00-310
1-1
How do you submit comments and recommendations to the M13520.1C
CG-22
1-2
What manual is the Aeronautical Engineering Maintenance Management manual
M13020.1
1-2
What is the CG Rescue and Survival Systems Manual
M10470.10
1-2
What equipment is excluded from the EO giving permission to a primary QA to visually and post usely inspect while on deployment
Inflatables and parachutes
1-3 Note
What has precedence over all other maintenance and inspection procedures
MSR cards
1-3
What are the ordnance publications
M8000.2
COMDNOTE 8000.3
1-4
Who designates a QA
EO As per M13020.1
1-5
Who shall perform the inspection of the preserver before every flight
Crew member that will wear it
M13520.1C P 2-19
What piece of survival equipment must have a post flight inspection
SEAS-1
M13520.1C P 2-19
When shall a life preserver and survival vest bladder be considered beyond repair
- Porous fabric areas on tubes that cause a visible leak
- Split or open bladder seams
- Holes cuts tears or punctures over 1in sq or within 1in of a seam
On an LPP-1A
M13520.1C P 2-20
What vests have no authorized repairs for bladders carrier or bladder she’ll
LPU-27/P-SAR WARRIOR
LPU-26/P
LPU-26/PE
M13520.1C P 2-20 Note
How shall vests be marked for drill purposes
“DRILL ONLY”
3/4 in black letters on 1 in white webbing attached to vest/container
M13520.1C P 2-20