C-130J Flashcards
How many hand operated fire extinguishers are provided on the aircraft
4
CGTO 1C-130J-1
P. 76
How long do you wait to taxi or tow aircraft after overheated brakes have been cooled
15 minutes
CGTO 1C-130J-1
P. 516
What type of cylinder and regulator is used for the MA-1 portable low pressure bottles
A-6 cylinder
A-21 pressure demanded regulator
CGTO 1C-130J-1
P. 540
What is the volume of the MA-1 bottle
280 cubic in
CGTO 1C-130J-1
P. 540
What is considered full pressure and how long will the supply last
450 psi
30 minutes at 400 psi
CGTO 1C-130J-1
P. 540
How many positions are on the selector knob of the regulator
4
CGTO 1C-130J-1
P. 540
If the MA-1 emergency oxygen bottle is not recharged within 2 hours after its pressure is reduced below ____ psi, thebottle must be purged IAW MPC
25
CGTO 1C-130J-1
P. 545
How soon after a hot purge should you service aircraft
NOTE: Aircraft oxygen system servicing will be required to begin within one hour after completion of hot purge process.
MPC 351010.0 P. 2
How far away from any aircraft performing fueling or engine/apu operations should you conduct aircraft purge
CONDUCT PURGING AT LEAST 75 FEET FROM ANY AIRCRAFT PERFORMING FUELING OR ENGINE/APU OPERATIONS.
MPC 351010.0 P. 3
EQUIPMENT SUPPLYING GASEOUS OXYGEN FOR HOT PURGING MUST HAVE SUFFICIENT QUANTITY TO MAINTAIN A CONSTANT FLOW AT ____ PSI FOR ____ MINUTES. DEPLETION OF GASEOUS OXYGEN PRIOR TO COMPLETION OF HOT PURGING EVOLUTION MAY CAUSE DAMAGE TO HOT PURGING UNIT.
90 psi
100 minutes
MPC 351010.0 p. 4
It is recommended that the LMO5HP LOX storage cylinder not be more that what percent full when purging
75 %
MPC 351010.0 p. 4
How far away from aircraft servicing panel should you position the LMO5HP LOX storage cylinder during hot purge
15 ft
MPC 351010.0 p. 4
Ensure electrical power cart has enough fuel to supply power for at least ___ minutes. Failure to do so will result in having to repeat hot purging procedure.
90 minutes
MPC 351010.0 p. 4
How far away should you position power cart from LMO5HP LOX storage cylinder during hot purge
50 ft
MPC 351010.0 p. 4
Where do you place the hot purge unit during a hot purge
Between between storage cylinder and aircraft oxygen servicing panel.
MPC 351010.0 p. 4
Plug one end of the heavy duty extension cord into a ___ ___Hz receptacle on electrical supply cart.
120V 60 Hz
MPC 351010.0 p. 4
What size safety wire is used for the 50 psi relief valve on the LMO5HP storage cylinder
0.020 in steel
MPC 351010.0 p. 6
What do you service LOX IAW
MPC 121401.0 within 1 hour of hot purge completion
MPC 351010.0 P. 6
How long do you allow for dwell time after servicing
30 minutes
MPC 351010.0 P. 7
Ensure that adequate serviceable fire protection equipment is placed within ___ feet of the LOX servicing operation.
50 feet
MPC 121401.0 p. 2