LOT 202.16 SGBD Flashcards

1
Q
  • LOT 202.16 SGBD*
    • *

What will cause a BDS Isolation signal?

A

SGNR Level - Low 2 [2/4 on 1/4]

SI

AMSAC

P-4 w/ Source Range Blocked

Shuts BDS ORC valves. (All SGs)

Must be manually reset on CP006.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q
  • LOT 202.16 SGBD*
    • *

What controls or indications are available in the MCR for the BDS?

A
  • CP006:*
  • *BDS Isolation Reset**
  • *BDS ORC Valves**
  • CP018:*
  • *BDS Flow Control**
  • *Augment Flow Control**
  • *Flash Tank Flow Control**
  • PV-4165*
  • *Flash Tank Level Control**
  • LV-4160A & LV-4160*
  • *In-Line Radiation Detectors**
  • 8022 → 8025*
  • RM-11:*
  • *All Radiation Detectors**
  • 8043 / 8022 → 8025*
  • RM-23:*
  • *In-Line Radiation Detectors**
  • 8022 → 8025*
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q
  • LOT 202.16 SGBD*
    • *

What hazard is associated with excessive blowdown flowrates?

A

Potential damage of 2” piping and Nozzle

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q
  • LOT 202.16 SGBD*
    • *

What provides cooling for the BDS HXs?

A

Condensate

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q
  • LOT 202.16 SGBD*
    • *

What is the maximum allowed temperature through the BDS demins?

A

140 ˚F

135 ˚F will shut LV‑4160 (Flash Tank Normal Level Control Valve) and Open LV-4160A (Flash Tank Bypass Level Control Valve)

Normally demins are bypassed. Used for S/U’s and tube ruptures.

  • Note:*
  • If Demins bypassed on CP018, LV-4160 will shut at 185 ˚F.*
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q
  • LOT 202.16 SGBD*
    • *

Where are the major components in the BDS physically located?

A
  • IVC:*
  • *Flow Control Valves (10’)**
  • Near AFW pumps*
  • *Recirc Pumps (10’) [4]**
  • *ORC Valves (21’)**
  • Above AFW pumps*
  • TGB:*
  • *Flash Tank (63’)**
  • S Mezzanine*
  • *BDS HXs (63’) [4]**
  • S Mezzanine*
  • MAB:*
  • *Prefilters (35’) [2]**
  • *Demins (35’) [2]**
  • (Normally connected in series)*
  • *Offline Monitor (RT-8043) (41’)**
  • Solid Waste Handling Area*
  • EAB:*
  • *RT8022/8024 [A/C SGs] 60’**
  • Pen Space*
  • *RT8023/8025 [B/D SGs] 10’**
  • Pen Space*
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q
  • LOT 202.16 SGBD*
    • *

What is the purpose of the offline radiation monitor (RT-8043)?

A

Prevents discharge of contaminated BD to Neutralization Basin

Other 4 in-line monitors (RT8022-8025) detect primary → secondary leakage.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q
  • LOT 202.16 SGBD*
    • *

Where in the S/G does blowdown take suction?

A
  • Normal:*
  • *Just above tubesheet**
  • 96 gpm*
  • High Flow B/D:*
  • *Downcomer**
  • 190 gpm (1 SG at a time)*
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q
  • LOT 202.16 SGBD*
    • *

What will cause the BDS Flash Tank steam to re-align from FW HTRS 13A/13B to the main condenser?

A

Turbine Trip

OR

High 2 level in FW HTR 13A AND 13B

High 2 level in one FW HTR will shut isolation valve for that FW HTR but steam will still be supplied to the other FW HTR.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q
  • LOT 202.16 SGBD*
    • *

What is the allowable primary → secondary leakeage?

A

≤ 150 gpd

Considered identified leakage.

LCO 3.4.6.2 Operational Leakage

How well did you know this?
1
Not at all
2
3
4
5
Perfectly