LCO/TLCO Flashcards

1
Q

3.4.14 RCS Operational LEAKAGE

A

a. No pressure boundary LEAKAGE
b. 1 gpm unidentified LEAKAGE
c. 10 gpm identified LEAKAGE
d. 150 gallons per day primary to secondary LEAKAGE through any one steam generator
e.
APPLICABILITY: MODES 1, 2, 3, and 4.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

3.4.15 RCS Pressure Isolation Valve (PIV) LEAKAGE

A

Leakage from each RCS PIV shall be within limits.

APPLICABILITY: MODES 1, 2, and 3, MODE 4, except valves in the shutdown cooling flow path where in, or during the transition to or from, the SDC mode of operation

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

3.4.16 RCS LEAKAGE Detection Instrumentation

A

a. One containment sump monitor; and

b. One containment atmosphere radioactivity monitor (gaseous and particulate).

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

3.7.14 Fuel Storage Pool Water Level

A

The fuel storage pool water shall be ≥ 23 feet over the top of irradiated fuel assemblies seated in the storage racks.

APPLICABILITY: During movement of irradiated fuel assemblies in the fuel storage pool.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

3.7.15 Fuel Storage Pool Boron Concentration

A

The fuel storage pool boron concentration shall be ≥ 2150 ppm.

APPLICABILITY: Whenever any fuel assembly is stored in the fuel storage pool.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

3.7.17 Spent Fuel Assembly Storage

A

The combination of initial enrichment, burnup, and decay time of each fuel assembly stored in each of the four regions of the fuel storage pool shall be within the acceptable burnup domain for each region show in (figures) and described in Specification 4.3.1.1

APPLICABILITY: Whenever any fuel assembly is stored in the fuel storage pool.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

3.1.100 Flow Paths – Shutdown

A

As a minimum, one of the following boron injection flow paths shall be FUNCTIONAL:

a. If only the spent fuel pool in TLCO 3.1.104.a. is FUNCTIONAL, a flow path from the spent fuel pool via gravity feed connection and a charging pump to the RCS.
b. If only the refueling water tank in Specification 3.1.104.b. is FUNCTIONAL, a flow path from the RWT via either a charging pump, HPSI or LPSI pump to the RCS.

APPLICABILITY: MODES 5 and 6

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

3.1.101 Flow Paths – Operating

A

At least two of the following three boron injection flow paths shall be FUNCTIONAL:

a. A gravity feed flow path from either the RWT or the SFP through CH-536 and a charging pump to the RCS
b. A gravity feed flow path from the RWT through CH-327 and a charging pump to the RCS
c. A flow path from either the RWT or SFP through CH-164, utilizing gravity feed and a charging pump to the RCS.

APPLICABILITY: MODES 1, 2, 3, and 4.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

3.7.13 Engineered Safety Feature (ESF) Pump Room Exhaust Air Cleanup System (PREACS)

A

Two ESF PREACS trains shall be OPERABLE.

APPLICABILITY: MODES 1, 2, 3, and 4.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

3.9.104 Fuel Building Essential Ventilation System (FBEVS)

A

Two FBEVS trains shall be OPERABLE.

APPLICABILITY: During movement of irradiated fuel assemblies in the Fuel Building.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

3.7.11 Control Room Essential Filtration System (CREFS)

A

Two CREFS trains shall be OPERABLE
Note: Control Room Envelope boundary may be opened intermittently under administrative control

APPLICABILITY: All MODES

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

3.7.205 Control Room Emergency Air Temperature Control System (CREACTS)

A

The control room air temperature shall be maintained less than or equal to 80F