ISDS DSM Ch 16 Flashcards
Which one of the following is a concern expressed by suppliers who are in partnership with JIT organizations?
a. Large lot sizes
b. Having limited ability to respond to changes in product and quality
c. Having too many customers
b. Having limited ability to respond to changes in product and quality
Focus on continious improvement is decsribed by _____________.
a. Kaizen event
b. Kanban
c. Kaizen
c. Kaizen
What is the rate required to push orders through the production process?
a. Push time
b. Throughput time
c. Manufacturing cycle time
b. Throughput time
Lead time for computers is 7 days with daily demand of 5 computers and a safety stock of 1 day. Each kanban holds 8 computers. What is the correct number of kanbans?\
a. 7
b. 8
c. 5
c. 5
Lead time for computers is 5 days with a daily demand of 25 and safety stock of 5 computers. If management wants to use 10 kanbans how many computers should each one hold?
a. 10
b. 13
c. 5
b. 13
Which one of the following is not a layout tactic in a Lean environment?
a. Fixed equipment
b. Work cells for families of products
c. Minimizing distance
a. Fixed equipment
Which of the following is not characteristic of a TPS employee?
a. Knowledgeable
b. Empowered
c. Strict job classifications
c. Strict job classifications
Which of the following is generally found in most JIT environments?
a. Pull systems
b. Push systems
c. A push or pull system, depending upon the rate of demand
a. Pull systems
The technique known as level schedules:
a. is based on meeting one week’s demand.
b. allows for variance in scheduling between batches
c. processes many small batches rather than one large batch.
c. processes many small batches rather than one large batch.
If a casual-dining restaurant is attempting to practice JIT and lean operations, which of the following would not be present?
a. Food preparation in large batches
b. Close relationship with the restaurant’s suppliers of food, utensils, and equipment
c. A kitchen set up to minimize unnecessary movement
a. Food preparation in large batches
Which of the following is not a reason for variability?
a. Customer demand is unknown
b. Employees, machines, and suppliers follow production standards
c. Engineering drawings are incomplete
b. Employees, machines, and suppliers follow production standards
Which of the following is not a goal of Lean Partnerships?
a. Removal of in-plant inventory
b. Removal of engineering changes
c. Removal of receiving activities
b. Removal of engineering changes
Lean makes quality less expensive because __________.
a. it hides quality improvement costs in inventory
b. it uses larger batch production
c. it prevents long runs of defects
c. it prevents long runs of defects
Which one of the following is an example of Lean being used for competitive advantage?
a. Jones Company has decreased the number of job classifications to just a few
b. Lafourche Metals increases the number of suppliers to be less dependent on just a few
c. Houma Fabricators is proud to announce that incoming goods are inspected
a. Jones Company has decreased the number of job classifications to just a few
A firm wants to develop a level material use schedule based on the following data. What should be the setup cost?
Desired lot size:
60
Annual demand:
40,000
Holding cost:
$20 per unit per year
Daily production rate:
320
Work days per year:
250
answers:
a. $4.50
b. $0.45
c. $45
b. $0.45