Integrative Process Flashcards
Credit applicability
All rating systems in the building design and construction umbrella
IP Phases
- Discovery
- Implementation
- Performance Feedback
Discovery
Pre-Charette
Basic water and energy analysis
Implementation
Understand system interactions found in discovery
Use analysis in Discovery to create OPR and BOD
Pre-Design
Data collection
Discussions of project goals
Green technologies
Design
- Schematic Design (SD) - preparation of preliminary design options and project layout
- Design Development (DD) - more detailed design of the building and its energy systems
- Construction Documents (CD) - preparation of the detailed construction documents which are needed for permissions and bidding
Bidding
The process of selecting the contractor to prepare for the construction phase
Commissioning
Process to achieve, verify, and document the facilities and systems will perform as designed and installed. This ensures building quality through on-site verification.
Occupancy
Certificate of Occupancy has been issued and the building can be occupied