INSCOM 95-1 Flashcards

1
Q

Aviators other than those assigned to _____ are not permitted to act as crew members on _____ aircraft without prior written approval of INSCOM G3 Director Aerial ISR

A

INSCOM

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

The Individual Flight Records Folder (IFRF) and individual Aircrew Training Folder (IATF) for aircrews assigned to now operational aviation positions within INSCOM shall be kept in an inactive file at the _______

A

Nearest army flight operations record facility

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

The final mission approval authority for EXTREMELY HIGH missions is ____ ____

A

CG INSCOM

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

T/F

Only mission essential personnel are authorized to fly aboard SEMA

Who will determine those who are mission essential?

A

True

The Battalion Commander

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Simulated engine failure will not be initiated Below ____’ AGL on approach or anytime the AC has decelerated below ____

A

200’

VSSE/V2

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Simulated engine malfunctions while in the traffic pattern, simulated engine out Landing, simulated engine failure on takeoff, and engine out to go around in the traffic pattern will be conducted at airfields with

1)
2)
3)

A

1) operational control towers
2) established coms with the airfield
3) operational crash rescue on site

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

An alternate airfield, within __ hour(s) at engine out cruise airspeed of the departure airfield, is required when at the time of departure, the departure airfield weather is below the _________________. The airfield within one hour at engine out cruise airspeed serves the purpose of a recovery airfield for takeoff and departure emergencies. Recovery effort must meet the alternate air field selection requirements in _____.

A

1

landing minimums for the approach to be flown.

AR95-1

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

One mission approval may suffice for a multiple day mission as long as the original flight crew stays intact and changes to mission parameters do not result in a increased ______ risk

A

Resultant

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Non-INSCOM personnel are not permitted to fly aboard SEMA, without the prior written approval from _____ G3 aerial ISR

A

INSCOM

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

A simulated engine out go- around will not be initiated if the aircraft has decelerated below ____

A

VSSE/V2

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Recovery altitude for training emergency descent and evasive maneuvers, unusual attitudes, and approach to a stall will be no less than ____ ft. AGL

A

4000

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

When returning from TDY, leave, or a non-flying period Of ____ days or more the aviator will fly a minimum of one flight with a unit PC, UT, IP prior to performing duties as a PC

A

30

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Air crewmembers performing 24 hour duties (eg SDO, CQ) for any similar duties, will be provided a ____ hour reset prior to beginning a new duty. That involves the performance of any duties as outlined in paragraph 4C and 4D of this policy

A

24 hour

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

Fighter management is ____ for all aircrews

A

Mandatory

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

Aircrew members will be restricted from operating an aircraft within ____ hours of concluding PT

A

2 hours

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

A simulated engine out go around will not be initiated if the aircraft has decelerates below _____

A

VSSE/ V2

17
Q

For takeoff into IMC: all multi engine FW aircraft must have at least _____’ per NM second segment climb gradient

When this cannot be met procedures approved by high risk approval authority must be established to ensure obstacle clearance (RKSG’s ODP)

A

200’ per NM (3.3%)