Ice And Rain Protection Flashcards
The wing cross bleed valve fails?
In last known position
The wing anti-ice system is automatically controlled by
The AILC
anti-ice and leak detection controller
Wing anti-ice Valves fail?
Closed
T2 probe provides?
Temperature data to theFADEC
FADEC uses T2 info to?
Set engine power and control the VG vanes
T2 heater function testing?
After right engine shutdown
Electrical power maintained on aircraft for at least one minute
During icing conditions The ice detectors are electrically deiced??
For 5 seconds every 60 seconds
What stage bleed air is used for wing anti-ice
10th stage engine bleed air
How is hot bleed air supplied to the wing?
Through ducting and released through piccolo tubes
Cowl anti ice valves?
? Controlled
? Operated
Electrically controlled
Pneumatically operated
Failsafe open
How many air data sensing heater controllers?
3
On the ground are the probes heated?
On ground
Either Gen operative
Probe switches off
L/R/stby pitots heated half power
__________________________________
Probes on? All powered excpt TAT
(Static ports,base heaters,AOA , pitots)
Probes switches in flight?
Full power regardless of switch position
Which side is the TAT probe on?
Right side
Windshield switches on high?
Windshields on high
Side windows low
When both wiper switches are in use which switch selection will determine the speed of both wipers?
The last switch selection
12-23 ch 12 Ice and rain protection
Cowls fail?
Open
How many probes need to detect icing to send an icing signal?
Just one probe
L/R PRSOV FAIL??
Closed
Wing anti-ice valves on the synoptics page show________valve position
Actual
They show the actual valve position
Wing anti-ice valves fail?
Closed
Wing overheat signal is generated by?
DCU
Cowl anti-ice valves fail?
Open
What monitors heating for air data probes and sensors?
3 ADSHC
Air data sensor heater controllers
On the ground which air data probes and sensors are not heated?
L/R pitot probe base
TAT