Highrise Flashcards

1
Q

Bridge Head

A
  • 2 floors below unless building features allow safe air to be reliably maintained in a position closer to fire.
  • should be Ff lobby, not corridor, unless building design results in corridor performing the lobby.
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

If bridgehead needs repositioning

A

1/ All informed of decision
2/ BA told to monitor air and reassess TAT
3/ Consider BA withdraw against urgency of task.
4/ ET must be at BH ASAP
5/ Move all to new BH
6/ Consider Stage 2
7/ If life saving delayed, consider alternative methods of rescue.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

High rise proc implemented TMO indicates RA carried out and SSOW in place.
Only sent when

A

1/ BH RA as appropriate for incident.
2/ Access & egress BH secured & maintained.
3/ BH est. with 2 charged jets deployed

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Committing Teams

A
  • Specific tasking of teams should be done at BH once IC decided to commit them above BH.
  • Fire SC Inform IC before committing BA
  • 1st jet 1 floor below. If unavailable then closest one below fire.
  • 2nd jet provided ASAP & 1 length longer & can be from fire floor or next available outlet. Can use additional outlet on dividing breech.

• IC can allow crews to work above BH without BA where no fire/smoke as long as confirm building construction and engineered solutions not compromised.
Comms must be maintained with BH & a SO in stairwell, in contact with SO and IC outside.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Evacuation. IC Consider

A

1/ following evac plan devised by RP’s RA.
2/ effect of FF tactics on evac.
3/ resources req. to support evac or stay put policy.
4/ If safe use other emergency services to support evac.
5/ need to est. separate attack & evac stairwell.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Ventilation. IC Consider;

A

1/ what impact wind may have if openings opened.
2/Enough resources to contain fire if need to breech any built in or engineered solutions.
3/ If risk can’t be properly assessed or sufficient control measures in place, ventilation should only be done post fire.
4/ Door stoppers only used above bridgehead on IC approval.
5/ vent system need door open in.
6/ FSO notify 4P attend 5P.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Safety Officers

A

•Appoint ASAP to monitor conditions in stairwell being used as BH.
• Appoint external to monitor all sides to check for;
1/ falling debris
2/ cordon maintenance
3/ external fire & smoke spread

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

FF shaft

A

> 18m must make provision for FF

Basic facilities;
FF shaft
Wet/dry main
FF lift

FF shaft inc. main may be found in certain buildings with floor height exceeding 7.5m.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Ff Lifts

A
• where possible should not be smaller 8 person and carry up to 850kg
• Fireman’s lift - normal lift fitted with Ff switch
• minimum for safe use by FFs 
1/ 2 power supplies
2/ water protection (IP rated)
3/ FF switch access level
4/ FF in car control 
5/Ff comms
6/ Floor indicators
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Dry riser

A
  • over 18 m

* min 1500 lt per min

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Wet riser

A
  • over 60m (2006 over 50m)
  • auto pump & 1 on stby
  • warning system to indicate low level
  • 1500ltr per min for 45 min
  • 4-5 bar prior 2006
  • 8 bar after 2006
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Water suppression

A
  • Residential >30m after 2006
  • detect/attack/audible warn
  • if extra water req take from different main unless sprinkled one large enough.
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Controlled dividing breech

A
  • only 1 per riser
  • not fire floor
  • jet 1 from breech, 2nd from riser, remaining breech outlet should be for jet 3 if req.
  • If burst length or reduction in supply both crews carry out DRA & consider withdrawal.
  • ECO inform Fire SC if water loss, who should isolate damaged lengths.
  • Any personnel must inform Fire SC if anything likely to affect water.
How well did you know this?
1
Not at all
2
3
4
5
Perfectly