What are the auto shutdown criteria?
- GTM L/O drops to 6 PSI.
- GG Hits 6 mils.
- PT Hits 10 mils.
- PTIT exceeds 1625* F.
GTG Specs?
- 4009 AMPs
- 60 Hz
- 450 Vtz
- 2500 Kw
LP Air Usage?
- Module vent dampeners.
- PT Brake.
- Blow-In doors.
- Leslie Valves.
- Hanger doors (electric and pneumatic).
Who signs MLOCS?
- CO
- XO
- CHENG
- MPA
- Personnel who complete required maintenance.
AUX1 Frame #?
126
MER1 Frame #?
174
AUX2 Frame #?
220
MER2 Frame #?
254
Shaft Alley Frame #?
300
3 Gen Frame #?
338
MGTEC Conditions?
- T5.4 over 1000*
- GG over 8000 RPM.
- No 5 minute cool down after shutting down GTM/GTG.
Where are the Full Power Run procedures?
MUFP
What are the parameters of the APD?
Auto Parallel Device
30* of Phase Angle (15* each direction).
0.2Hz
0.5V
What is the most important space to save?
MERII
Both shafts.
2 GTG, and fuel tanks for 3 GTG.
2 LPACs.
What is important to remember about starting 3 GTG?
To open vent casing on SWS pump, to release built up air.
What is the over speed alarm for GG?
9700 RPM
What is the max speed of the GG?
10,122 RPM, requires overhaul.
What is the over speed alarm for PT?
3852 RPM
What is the over speed trip for PT?
3960 RPM
What is max PT speed?
5,585, requires overhaul.
What is high vibes alarm and trip for GG?
6mils, 7mils
What is high vibes alarm and trip for PT?
7mils, 10mils
What is high TIT?
1600* alarm, 1625* trip.
What is low L/O alarm and trip on GTM?
15 PSI, 6 PSI
What is the LOSCA low sump alarm?
9.6 gallons
What are the SWS pumps rated at?
1450 GPM, 35 PSI
Loss of power restoration priorities?
- Power to SWBD and LC.
- Firemain.
- Sea Water Cooling.
- AC’s and Chill water.
- LP Air.
- L/O Service.
- F/O Service.
- Propulsion systems.
What is the most restrictive quiet ship?
Q1
Which quiet ship is for extended periods of time?
Q2
What GTMs do we use during Q1?
2A, 1B
What LOSPs do we use during Q1?
1A, 2A
What FOSPs do we use during Q1?
1A, 2B
Which GTGs do we use during Q1?
1 & 2
Which ACs do we use during Q1?
1 & 2
Which sea water service pumps do we use during Q1?
1 & 2, (and 5 for Q2)
Which fire pumps do we use during Q1?
3 (and 4 for Q2)
What LPAC do we use for Q1?
2 LPAC
Which HPUs do we use for Q1?
1B, 2B
How many ROs do we have?
2
How many potable water tanks and their capacity?
4, 4,000 gallons each.
How much do our are ROs produce each day?
12,000 gallons each.
What should be avoided with potable water hoses and fittings?
They should not be submersed in non-potable water at any time.
What color are potable water hoses?
Blue, used for potable water only.
What is the minimum residual required for potable water?
0.2 ppm after 30 mins in tanks.
What is the minimum residual required for potable water where amebiasis or hepatitis is epidemic or unapproved source is used?
2.0 ppm after 30 mins in tanks.