CHENG Standing Orders Flashcards
1
Q
What are 10 required reports to CHENG?
A
- Any questions about conduct of the watch or operation of equipment.
- Personnel unfit for watch.
- Equipment casualties.
- Personnel casualties.
- When expecting F/O or potable water to drop below 60%.
- When Tagging Out GTM’s or GTG’s.
- Prior to to optesting equipment previously briefed to the OOD.
- When RMD or Max Reliability is either set or secured.
- When the CO orders Battle Override.
- Start/Stop of F/O or L/O transfer.
- UNSAT L/O or F/O samples or metallic material found in samples.
- If any equipment is out of limits for more than one hour.
- Heat stress conditions.
- Setting/Securing emergency ahead pitch.
- Access to the MRG including clutch lockout.
- Aligning JP-5 to F/O service tanks (CO approved).
- Loading new software in to MCS.
- Operating Blow-In doors in manual.
- Operation of equipment outside parameters.
- Modification of equipment outside parameters.
- Before testing electrical distribution including ABTs.
- Tag Out of Fire Fighting equipment while plant is in operation.
- Transferring Freon or other ozone depleting substances.