CHENG Standing Orders Flashcards

1
Q

What are 10 required reports to CHENG?

A
  • Any questions about conduct of the watch or operation of equipment.
  • Personnel unfit for watch.
  • Equipment casualties.
  • Personnel casualties.
  • When expecting F/O or potable water to drop below 60%.
  • When Tagging Out GTM’s or GTG’s.
  • Prior to to optesting equipment previously briefed to the OOD.
  • When RMD or Max Reliability is either set or secured.
  • When the CO orders Battle Override.
  • Start/Stop of F/O or L/O transfer.
  • UNSAT L/O or F/O samples or metallic material found in samples.
  • If any equipment is out of limits for more than one hour.
  • Heat stress conditions.
  • Setting/Securing emergency ahead pitch.
  • Access to the MRG including clutch lockout.
  • Aligning JP-5 to F/O service tanks (CO approved).
  • Loading new software in to MCS.
  • Operating Blow-In doors in manual.
  • Operation of equipment outside parameters.
  • Modification of equipment outside parameters.
  • Before testing electrical distribution including ABTs.
  • Tag Out of Fire Fighting equipment while plant is in operation.
  • Transferring Freon or other ozone depleting substances.
How well did you know this?
1
Not at all
2
3
4
5
Perfectly