G-4 Flashcards
Suspended slab without beams + girders
One-way ribbed slab and two-way ribbed slab
A drop panel continuously from column to column (a continuous drop panel is called what )
Slab band (Ribbon beam)
What type of Falsework supports supports form work
Standard beam need a wider
Aluma-beam
Deck surface between elevator shafts + slab tables
Infill strips
Authority to make changes to a fly tables
Engineer
What Engineers look for during their inspections
That the falsework is safe prior to it’s use/ any flaws in the false work
Type of falsework hardware use # 2-4 “ x4”
Ellis clamp
Re-shoring for a suspended slab
Exposed concrete members must be supported until they gain their full design strength. The shoring that is placed under these recently stripped slabs is called “re-shoring”
Reinforcing steel in a suspended slab
When can stripping forms of suspended slabs begin?
Until they gain their full strength/ when engineer says
Caretaker when stripping a suspended slab
Falsework and form work is to be removed
removed so they can be “re-used”
Calc of concrete slab volume
Calc concrete girders volume
Calc clear span of the beams
Calf concrete beams volume
of trusses to make fly table “IH”
Widest spacing of Trusses table
of shore posts between table 16+17
of shore posts between table 16+17
of beams in the top chord of truss
When inspect for formwork + falsework
Everyday OR every time u come back
Calc slenderness ratio factor of a rough “4 x 4”
1/50 : 4/1 50 x 4 = 200
Calc “ “ “ 4” x 6”
200 bc smallest dimension
Help speed up shoring correct height