FINAL EXAM PREP !!!!!!! Flashcards
Reinforcing steel and concrete compatible?
Expands and contracts at same rate
Concrete is strongest in what stress?
Compression
Ideal temperature in curing concrete?
15° - 20°
Forms cleaned and oiled?
Before each use and after each use
Extra water added to concrete mix?
Increases slump, decreases 28 day strengt
Microscopic air bubbles added to concrete mix?
“Air entrainment” = helps curing
Compact the Sub-grade for Slab-on-grade?
Tamping over underground plumbing / on undisturbed soil
Transferring concrete from trucks to forms?
Pump trucks = 120 mins from water adding, conveyors on large sites with site-made batches, buckets
Best technique in placing concrete in wall forms?
Pump truck w elephant trunk hose - places closest to final location and NOT drop thru rebar
Properly consolidating fresh concrete
150mm into previous lift, 600mm spacing of vibration, bubbles stop coming to top, glistening & greenish surface / tap with hammer on outside of forms / external vibrators for steel forms
Concrete work term segregation
When aggregate gets seperated from cement paste
External vibrators used
Steel forms
Spandrel beam
Perimeter beam/girder - takes most load, formwork must be wider for work area/walkway
Reshoring for a suspended-slab
4x4 w/ Ellis clamps - screw jacks
Anchor bolts secured during a concrete placement
Template / cleat / hung from cleat