Final Exam - Small Study Guide Flashcards

1
Q

bullwhip effect

A

◦Causes large order size◦You want short order sizes

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What are the two thinsg that cause a bullwhip effect

A

‣ Stockout and misdue date

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What are the 2 things that reduces bullwhip effect

A

◦Short delivery and short order sizes reduces bullwhip effect

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Aggregate production plan

A

◦First step◦Beginning of everything◦More than 1-2 year

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

◦Production activity control

A

‣ Produces their own shit

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

◦Purchase planning and control

A

‣ Buy it

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Chase strategy

A

◦Chasing sales◦Produce whatever the sale is◦Whatever the supplier is they will give that exact amount.◦It is stable◦If its high skill labor it will not work for you

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Level strategy

A

◦Employment level is stable◦Inventory fluctuates

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

System nervousness

A

◦ Not enough time to react

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

◦ Lead capacity

A

‣ Need to built a new facility to have more production

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

◦Lag capacity

A

‣ Produce no matter what happens‣ Keep doing what you’re doing regardless what you’re doing.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

◦Best of breed

A

‣ Pick the best software

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

◦Single integrator solution

A

‣ Pick the company• For example, pick oracle for everything

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

Master production schedule

A

◦ Independent◦Quality and timing◦16 to 18

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

Bill of material

A

◦What component parts you need for the finish product

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

Material requirement planning◦This is going to be definitely going to be on the exam◦What are the three things you need [exam]

A

‣ 1. Master production schedule‣ 2. Bill of material‣ 3. Inventory status

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
17
Q

Material requirement schedule

A

◦Dependent◦It calculates the component parts◦Exact numbers

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
18
Q

◦Flow time

A

◦Flow time‣ When you produce one product

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
19
Q

◦Make span

A

‣ How much time it takes to product to produce match

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
20
Q

◦Lateness

A

◦Lateness‣ Positive and negative

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
21
Q

◦Tardiness

A

◦Tardiness‣ Only Positive

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
22
Q

◦Which one can’t be negative?

A

Tardiness

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
23
Q

◦Shortest processing time

A

◦Shortest processing time‣ Whatever you can finish the quickest

24
Q

◦Earliest due date

A

◦Earliest due date‣ Whatever has the earliest due date

25
Q

◦PDCA stands for

A

Plan do check act◦PDCA

26
Q

Plan do check act

A

Plan do check act◦Continuous improvement and control

27
Q

Total quality approach

A

Total quality approach◦ It’s top down approach◦Starts ceo and goes down

28
Q

ISO 9000

A

ISO 9000◦Certification quality standard in place◦It’s not required◦It’s good to make sure you have a good supplier

29
Q

Total cost of quality

A
  1. Control cost2. Failure cost
30
Q

[notes] Control cost (2)

A

Control cost (2)1. Prevention cost•‣ 2. Appraisal cost• Buying new machines for quality• Enhancing something

31
Q

Failure cost (2)

A

When your product fails‣ 2 types of failure cost• 1. External◦When you find a failure before it ships• 2. Internal◦You find In the company

32
Q

quality control tools

A

◦Histograms◦Excel◦Etc◦Tools

33
Q

◦ Kaizen

A

◦ Kaizen‣ Small steps for continuous improvement

34
Q

◦Poke yoke

A

◦Poke yoke‣ Design your product until its fail proof

35
Q

Six sigma

A

◦Approach you use seeks and finds for defects and errors◦Write formula on your notecards

36
Q

In process control

A

In process control◦ You check your production once in a while◦Every hour you check 10 out of 50 items

37
Q

[notes] Out process contorl

A

Out process contorl◦If you check it and its producing defects its out of control‣ Get more notes

38
Q

Finished goods control

A

Finished goods control◦ Check the goods when they are done

39
Q

Statistical process control

A

Statistical process control◦Definition: a methodology for monitoring quality and manufacturing control◦Moderate quality and eliminates causes of variation

40
Q

◦Common (natural) cause variation

A

◦Common (natural) cause variation‣ Happens regardless of the process‣ Can’t change nothing about it

41
Q

◦Special (assignable) cause variation

A

◦Special (assignable) cause variation‣ Huge variation in the product or service‣ You can trace the variation

42
Q

◦Processwhat type of variation

A

◦Process‣ Common variation

43
Q

◦process out controlwhat type of variation

A

◦process out control‣ Common and special variation

44
Q

◦Variable

A

◦Variable‣ Measures on a continuous scale

45
Q

◦Attribute

A

◦Attribute‣ Its a yes or no

46
Q

‣ X bar

A

‣ X bar• Central tendency

47
Q

‣ R chart

A

‣ R chart• Dispersion

48
Q

‣ P-chart

A

‣ P-chart• Measures Proportions of defects

49
Q

‣ C-chart

A

‣ C-chart• Defects per unit

50
Q

Just in time

A

Just in time◦JIT◦Eliminating waste or lean operating systems◦Ship directly to point of use‣ Need to use immediately◦short orders and more frequently

51
Q

Visual control

A

Visual control◦Digital or cutboard◦Thing that tells you to keep producing or stop producing

52
Q

Lean six sigma definition

A

Lean six sigma definition ◦Eliminate waste

53
Q

Lean six sigma ◦3 things

A

Lean six sigma ◦3 things‣ 1. High quality,‣ 2. small variation‣ 3. Continuous improvement

54
Q

Pull system

A

Pull system◦Strategy to reduce waste◦You use this for JIT

55
Q

• Must importance of JIT◦Advantage (2)

A

• Must importance of JIT◦Advantage (2) ‣ 1. Improve and enhance your operations‣ 2. Continuous improvement and waste elimination