What preparation should be taken prior to a load line survey?
-All non-return valves on overboard discharge are effective.
-Ensure rigged lifelines are in good order.
-De-scale and repaint deck line, load line and draught marks.
-Check all machinery spaces on open decks.
-The efficiency of storing portable beams.
-Check doors.
-Check cargo hatches.
-Check ventilator openings.
What is in a capacity plan?
A capacity plan includes:
-Available space for cargo, fuel, freshwater, ballast.
-cubic of weight capacity list for the following spaces.
-deadweight scale showing various draughts due to deadweight.
What is in a general arrangement plan?
A general arrangement plan includes:
-Frame spacing.
-Frame locations numbered aft going forward.
-Location of tanks, engine room, service spaces.
-Names all crew and accommodation spaces.
-Location of transverse watertight bulkheads.
What is in a rigging plan?
A rigging plan includes:
-SWL of cranes, derricks, store cranes.
-Location of mat stays.
-Location of gangways and accommodation ladders.
-Timber lashings if a timber carrying vessel.
What is the purpose of a planned maintenance system?
The purpose of a PMS is to allow shipowners and operators to plan, perform and document vessel maintenance at intervals complying with the class and manufacturer requirements.