Extra Flashcards

1
Q

What preparation should be taken prior to a load line survey?

A

-All non-return valves on overboard discharge are effective.
-Ensure rigged lifelines are in good order.
-De-scale and repaint deck line, load line and draught marks.
-Check all machinery spaces on open decks.
-The efficiency of storing portable beams.
-Check doors.
-Check cargo hatches.
-Check ventilator openings.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What is in a capacity plan?

A

A capacity plan includes:
-Available space for cargo, fuel, freshwater, ballast.
-cubic of weight capacity list for the following spaces.
-deadweight scale showing various draughts due to deadweight.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What is in a general arrangement plan?

A

A general arrangement plan includes:
-Frame spacing.
-Frame locations numbered aft going forward.
-Location of tanks, engine room, service spaces.
-Names all crew and accommodation spaces.
-Location of transverse watertight bulkheads.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What is in a rigging plan?

A

A rigging plan includes:
-SWL of cranes, derricks, store cranes.
-Location of mat stays.
-Location of gangways and accommodation ladders.
-Timber lashings if a timber carrying vessel.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

What is the purpose of a planned maintenance system?

A

The purpose of a PMS is to allow shipowners and operators to plan, perform and document vessel maintenance at intervals complying with the class and manufacturer requirements.