EOP SGTR Flashcards

SGTR

1
Q

What are the Entry Conditions for E-3?

A
  1. ) SG Tubes Not Intact (E-0)2. ) Secondary Rad Abnormal 3. ) SG Level Rises Uncontrollably 4. ) In ECA-3.3 when PRZ Pressure control is restored.
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

E-3 Major Action Categories?

A
  1. ) 1. Identify / Isolate Ruptured SG2. ) Cooldown to get margin for Subcooling3. ) Depressurize to match S/G press and restore RCS level 4. ) Terminate SI5. ) Prepare to Cool Down to RHR.
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What are the E-3 Transitions?

A

All 3 Series ECA and ES Procedures.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What is The DP Maintained Between Intact and Ruptured SG in E3?

A

250lbs DP is maintained to ensure SC while the primary to secondary leakage is stopped.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

What is the preferred order for INITIALLY depressurizing in E3?

A
  1. ) Normal Spray 2. ) PRZ PORV3. ) Aux Spray (IF LD In Service)
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

What is the preferred order for BALANCING SG and RCS Pressure in E3?

A
  1. ) Normal Spray2. ) Aux Spray3. ) PRZ PORV
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What is the Radiological concern with Iodine in a SGTR?

A

Iodine concentrates in the SG while steaming. (Iodine Partitioning) This becomes an even larger problem if the SG is overfilled.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

How is SG Overfilling Prevented in E-3?

A

Isolating Ruptured SG, Cool Down and Depressurize RCS, and then Terminate SI.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

What are the concern with overfilling a SG?

A
    • MS Line not designed for weight of water and water hammer. - - PORVs, Safeties, and TDAFP NOT designed for water.
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

What is done to the Ruptures SG PORV?

A

The ruptured SG PORV setpoint is raised to 1040lbs to limit the release and maintain DP to intact SGs.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

What is the minimum lvl establish in a ruptured SG?

A

13% NR to ensure the SG tubes are covered. This also ensures a separation of the steam space from the tubes to prevent condensation and SG Pressure from lowering.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

What is the cool down rate in E-3?

A

MAXIMUM. - -Dumps (If available)- -Intact SG PORVS

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

What is unique about the RCP Trip Criteria in E-3?

A

RCPs are not tripped when RCS Press <1300lbs IF Cool Down has been started.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

What is the basis for the target temperatures for the cool down in E-3?

A

Maintain at least 20 Deg Sub Cooling for SI Reinitiation.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

What is the Concern with The cold Leg Temps on Nat Circ?

A

There is a possibility of false CL indications on Loops with a SGTR. Tcold indication on this loop is disregarded for Integrity CSF.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

Then in CSFST For integrity disregarded in E-3?

A

ONLY when on NAT circ for the associated CL indicated for a loop with a STGR. This is ONLY applicable in E-3.

17
Q

What is an indication of RX Head Voiding in E-3?

A

Rapidly rising Prz Lvl while depressurizing RCS.

18
Q

What are the Indications of a SGTR?

A
  • NR Lvl Rising uncontrollably.- Secondary Rad (BD 31/32, SJAE 19, GS 18) PORVs (If Open)- FF/SF Miss Match- NO RCP Provides false indication of SGTR. (MONITOR)
19
Q

The is the Definition of a SG Tube Leak?

A

Leak capacity is within the capacity of a charging pump in normal alignment.

20
Q

What is a SGTR?

A

Leak is GREATER than the capacity of a CCP with max flow and no LD. TRIP and SI required.