1
Q

What are the stabilization bands of EOP-8, Loss of Offsite Power/Forced Circultation?

A

Depending on actual temperatures, pressures and levels…..

Tave: 525F-540F target 532F

Pressurizer Pressure: 2050 - 2070 psi, target 2060

Pressurizer Level: 42-57%, in cascade

SG Level: 60-70% target 65%

SG Pressure: Commenserate with Conditions

Cooldown: 0

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What are possible bands for EOP-3, Station Blackout?

A

Tave: 525F-540F target 532F - utilizing ADVs

SG Level: 60-70% target 65%

SG Pressure: Commenserate with Conditions

Cooldown: 0

No control over PCS pressure, Pressurizer Level

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What are potential bands for EOP-4, LOCA?

A

We will cooldown, so utilize subcooling:

PCS Pressure/Temp: 30-50F via subcooling, watch upper range for inclusion.

Pressurizer Level, notify on scale, then set band.

SG Level 60-70% target 65%, watch lower range for inclusion.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What are some possible bands for EOP-5, SGTR?

A

PCS Pressure/Temp via subcooling: 30-45/ target 35F

  • Notify when all Thots less than 524F
  • Notify when PCS pressure less than 940 psi and within 50 PSID positive of faulted SG

Pressurizer Level

  • Notify when on scale
  • Set band 42-57% target 46% if not in cascade.

SG Pressure

  • Maintain isolated faulted SG less than 940F. Notify at 900 psi.
  • Good generator - commensorate

SG Level

  • Faulted, less than 140%, 110% for degraded: Noftify at 100%
  • Good generator: 60-70%, target 65%.

Cooldown: 80-100F, target 90F

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

What are potential bands for ESDE?

A

PCS Pressure

  • Notify at 1605 - for SIAS
  • Notify at 1300 - for PCP
  • Notify at min pump op curve on Supplement 1

PCS Temperature

  • Notify at prior to Tcold <450F - for PCP
  • Notify at prior to Tcold< 300F - for PCP
  • Notify when faulted SG loop Tcold stop lowering

Pressurizer Level

  • Notify on scale
  • 0-40%
  • 40% to 57%, target 42%

SG Level

  • Faulted: N/A
  • Good: 60-70%, target 65%

SG Pressure

  • Faulted: N/A
  • Good: Within 50 PSID positive of faulted.

Cooldown

  • Do not add to cooldown
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

What are possible bands for EOP-7, LOAF?

A

Depends on strategy to be employed.

Option 1 - Stabilize

  • Tave: 525F-540F target 532F
  • Pressurizer Pressure: 2050 - 2070 psi, target 2060
  • Pressurizer Level: 42-57%, in cascade
  • SG Level:
    • Notify at -50%
  • SG Pressure: Commenserate with Conditions
  • Cooldown: 0

Option 2 - Cooldown to support Condensate Pump Feeding

PCS Temp/Pressure

  • 30-50F Subcooling, target 40F

Pressurizer Level

  • 42-57%

SG Level

  • Notify at -50%

SG Pressure

  • Notify when SG pressure approximately 500 psi

Cooldown Rate

  • 80-100F/hr target 90F
How well did you know this?
1
Not at all
2
3
4
5
Perfectly