Critical Path Analysis Flashcards

1
Q

What is Critical Path Analysis?

A

compile a list of all activities/work breakdown structure (1)
 work out the length of time/duration required for each
activity (1)
 determine the relationships/links between the activities (1)
 determine specific points of time in the
process/milestones/deliverable items (1).