CONTROL TEST Flashcards
5S audit activities are conducted in the ____________ phase of 5S
Sustain
A Belt has collected measurements for a product and has its target value. She wants to monitor the cumulative sum of the differences of each measurement from a target. Select the chart from the following that is appropriate for her needs.
CUSUM chart
A Belt has decided to use a control method that can monitor the process output and adjust the input factors without human intervention to sustain process output. This method is known as:
A fully automated system.
A Belt needs to monitor the errors in the reports prepared by the quality team each day. The number of reports per day is fixed. What chart should she use?
a.
U chart- varying attribute poisson
b.
P chart-defect- varying units attribute data binomial
c.
C chart-fixed number of defects/constant poisson
d.
I chart-intervals
C chart
A Belt studied a control chart and found that all the data points are randomly distributed about the centerline and well within the control limits. What could she conclude wrongly?
a.
Only common cause variation is present in the process.
b.
The process is capable.
c.
The process is in control statistically.
d.
The process is predictable.
The process is capable.
A higher sampling rate with smaller subgroups provides process information more frequently.
T/F
TRUE
A pizza shop has a system in place to collect the weight data of each pizza prepared. The shop owner wants to know if there is an upward shift or downward shift in the preparation process mean separately. Which chart can be used?
a.
X-bar R chart
b.
One-sided CUSUM chart
c. EWMA chart (hours, shifts, days, week, month)
d.
Two-sided CUSUM chart
One-sided CUSUM chart
primary purpose of a control plan is to:
a.
Control the process outputs.
b.
Make the process owner accountable.
c.
Provide control methods.
d.
Detect if the process ¡s out of control.
Make the process owner accountable.
Control charts are generally used to detect if the process has:
a.
Only common-cause variation.
b.
Met customer requirements.
c.
Reached its acceptable level.
d.
Special cause variation.
Special cause variation.
Documentation is necessary for institutionalization of improvements, new processes, and standards of Lean Six Sigma projects.
a.
True
b.
False
TRUE
For an effective kanban system, the team should maintain which of the following factors?
a.
Consistent cycle times
b.
Standardized kanban bins
c.
Low defect rate in incoming product or service
d.
All of the above
All of the above
For an X-bar chart, the centerline is calculated as:
a.
The average of all individual data points.
b.
The average proportion of all subgroups.
c.
The average of ranges of all subgroups.
d.
The average of averages of all subgroups.
The average of averages of all subgroups.
In an EWMA formula, the starting value can be a target value if it is provided or is the average of some preliminary data.
a.
True
b.
False
TRUE
In Shewhart control charts, the space between the centerline and a control limit is divided into ____ zones to detect out-of-control situations.
a.
three
b.
five
c.
two
d.
six
3
In the U chart, upper control limit, UCL = u̅ + 3√ u̅/ni, where u̅ = average number of defects per unit and ni = number of units in subgroup i. What will be the impact on UCL if the subgroup size increases?
a.
The UCL will decrease.
b.
The UCL will also increase.
c.
The UCL has no relation to the subgroup size.
d.
The subgroup size has a direct impact on the UCL.
The UCL will decrease.