Code, Standards, and Practices 1, Based on the 2020 NEC Online Materials: Lesson 9 General Requirements Related to Installing Industrial Wiring Devices Flashcards
Wire mesh grips provide ? and absorb ? .
Select one:
a.stress / leverage
b.support / stress
c.vibration / pull
d.weight / pull
support / stress
Strain relief grips differ from support grips in that they have ? attachments that are easily attached to a junction box or panel.
Select one:
a.bushing
b.fitting
c.locknut
d.union
fitting
Mechanically interlocked receptacles allow for the safe connection of power to permanently installed electrical equipment.
Select one:
True
False
False
What method of overload protection for equipment at the source of power access is employed within selected Pass & Seymour Legrand switches and interlocked receptacles?
Select one:
a.Circuit breakers
b.Emergency stop button
c.Fusing
d.Overload relay
Fusing
The UL 508 listing on non-fusible safety switches allows these products to be used for ? .
Select one:
a.the avoidance of machine downtime due to the integral blown fuse indication function
b.the overload protection of portable equipment at the source of power access
c.the purpose of a manual motor controller that can be additionally used as a disconnect switch
the purpose of a manual motor controller that can be additionally used as a disconnect switch
The IEC 309 clocking system prevents the mating of plugs and receptacles of different ? and ? ratings.
Select one:
a.current / resistance
b.current / voltage
c.impedance / resistance
d.impedance / voltage
current / voltage
The acronym IEC stands for ? .
Select one:
a. Industrial Electrical Contractor
b. Instrumentation Engineering Consultant
c. International Electrotechnical Commission
d. International Electrical Committee
International Electrotechnical Commission
The IEC 309 clocking system dictates that the ground contact position for all female connectors and receptacles is based upon a clock face, with the keyway always being located at ? .
Select one:
a. 12:00
b. 3:00
c. 6:00
d. 9:00
6:00
Locking plugs and connectors are used in applications where ? is a primary concern.
Select one:
a. assured/consistent connections
b. child safety
c. environmental conditions
d. high voltage
assured/consistent connections
Straight blade plugs and connectors come in what two primary amperage ratings?
Select one:
a. 15 A and 20 A
b. 16 A and 29 A
c. 100 A and 125 A
d. White and ivory
15 A and 20 A
What should be done before preparing to install an industrial wiring device?
Select one:
a. Meet the lockout/tagout requirements of OSHA and NFPA 70E
b. Remove all the light bulbs
c. Strip the wire
d. Tighten the terminal screws of the device
Meet the lockout/tagout requirements of OSHA and NFPA 70E
Which of the following describes a wiring device utilizing blades that when inserted into a receptacle establishes a connection between the conductors of the attached flexible cord and the conductors connected to the receptacle?
Select one:
a. Connector
b. IEC
c. Plug
d. Receptacle
Plug
Common elements in the construction of an industrial wiring device include ? .
Select one:
a.assembly screws
b. back body
c. cord grip
d. terminals
e.all of the above
All of the above
Watertight plugs and connectors are designed for ? environments.
Select one:
a. cold and exposed
`
b. dry and hot
c. dusty and splashproof
d. wet and damp
wet and damp