Ch 8: Facility Layout Flashcards
facility layout
what is the best way to design a workplace to get the best functionality; process of determining placement of departments, workstations, machines, etc.
designing a facility layout requires following inputs (5)
Specification of objectives (space and design)
Estimates of demand
Processing requirements (# of operations
Space requirements for the elements
Space availability
______ ________ will enable the best utilization of space; improve flow of info; improve employee morale; safe working conditions
property layout
an economical layout will meet the following requirements (4)
Product design/volume (product strategy)
Process equipment/capacity (process strategy)
Quality of work-life (human resource strategy)
Building and site constraints (locations strategy)
product design/volume
product strategy
process equipment/capacity
process strategy
quality of work-life
human resource strategy
building and site constraints
locations strategy
service layout strategy
expose customers to high value items (ex. Grocery store)
storage layout strategy
minimize handling costs (ex. Warehouse)
strategy of product oriented layout
minimize line imbalance (ex. TV assembly line)
4 basic product layout formulas
work-center/process layout;
assembly line/product layout;
manufacturing cell/group tech.;
project layout/fixed position
work center/process layout
job-shop/functional layout; focused on completion of a task (ex. Hospital, machine shop)
assembly line/product layout
flow-shop layout; uses standardized processing operations to achieve smooth, rapid, high volume flow
manufacturing cell/group tech.
combines process and product layouts; machines are grouped in a cell that can process items with similar processing requirements (ex. Computers, laptops, phones)