CBA Flashcards

1
Q

State how Control Room pressure is maintained

A

CBA-DP-28 modulates to maintain CR pressure

The Controller output is clipped at 9% to prevent fan trip

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

State inlock for CBA-FN-15

A

Supply fan FN-27A/B must be running for FN-15 to start
DP-28 must be open for fan to start
Closure of DP-28 will cause FN-15 to stop

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Discuss supply fan discharge dampers on CRFRM

A

Supply dampers 53A/B are cross train powered to ensure that both FN-27A/B are stopped on single train actuation

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

State how CBA responds on LOP

A

DP-27A/B fail open on LOP. When FN-16A/B is reenergized it will see DP-27A/B not full closed and start the CR in CRFRM

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

State the CRFRM actuation signals

A
  • Hi rad in either intake in either train Rad Monitor, both channels in either train of Rad monitor
  • Manually starting CBA-FN-16A/B or CRFRM
  • LOP due to DP-27A/B failing open
  • Any SI due to DP-27A/B opening
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

State how to recover from CRFRM

A
  • Remove CRFRM signal (SI, Hi rad, Switch back to Auto)

- Stop FN-16A/B

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

State how Discharge dampers are arranged by train

A

DP-28 is dual trained
DP-1058 is only B train
So…either train CRFRM will close 28, 1058 will only close on B

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

State the response of the Safety Related CBA chillers on LOP

A

Since the NNS chillers are powered from bus 1

the Safety related chillers will start when their E-bus is repowered and then load at step 5

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

State what needs happed if 1 train of CBA rad monitoring is OOS (T.S. 3.3.3.1)

A

Within 1 hour initiate and maintain CRFRM

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

State what must be done if the CRE is inoperable (T.S. 3.7.6.1)

A

Immediately initiate action to implement mitigating actions or be in at least HOT STANDBY within the next 6 hours

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

State what must be done if both trains of CRFRM are inoperable

A

enter T.S. 3.0.3

How well did you know this?
1
Not at all
2
3
4
5
Perfectly