Buckeye Pipeline Flashcards
Composed of 2-12” steel pipes…
1-gasoline
1-kerosene (aviation fuel)
Automatic valves?
require no action by FD personnel
Wrenches?
- short tee- open hinged cover of valve
- 3 1/2 ft long yellow wrench-female fitting to mate with male in valve box
- combo wrench-combines short and long (yellow, also 3 1/2” long)
-manual shut off valves, generally located below ground in a valve using under a hinged cover
Shippers line–extended from LONG ISLAND CITY TERMINAL
24 FULL TURNS CLOCKWISE
ALL Valves? (exception shippers line)
42 FULL TURNS CLOCKWISE
Pipeline profile cards show elevation of valves above sea level and the AMOUNT OF PRODUCT CARRIED IN BARRELS BETWEEN EACH VALVE
Shippers line card issued to units concerned
profile cards have also been placed in each valve box …missing cards reported to buckeye pipeline coordinator at DIVISION 8
issued to each ASSIGNED AND ALTERNATE UNIT
Unit alarm assignment card and instruction card for that section
2 sets each-apparatus and prominent place at housewatch
extra wrenches hung on wall near housewatch
Engine companies responding from quarters on the second alarm for a street box associated with leak, should…
PLACE ADDITIONAL FOAMS CANS on apparatus
note:engine out of quarters, receiving notification to respond, should NOT RETURN TO QUARTERS for extra foam
(additional foam cans will be stored with spare wrenches)
Gallons per Barrel?
42
When response to a street box, reveals that the alarm was transmitted for a LEAK from the pipeline..IC shall transmit?
2nd alarm
- dispatch will transmit using street box to which units originally responded as per SOP
- however if leak is found a distance from this location, dispatch shall use a closer box location
Units without special wrenches, maps, cards?
Notify dispatcher
Valves should always be closed per duties by instruction cards, except….?
to PROTECT LIFE IN A SERIOUS LIFE THREATENING SITUATION
-if this unit is diverted from isolation duties, notify dispatch
Patrol by foot or apparatus..
closing valve and patrol-SIMULTANEOUSLY
-FOOT- 2 HT MEMBERS
-units other than those assigned to isolation duties will respond to the Command Post
Units performing Isolation duties will announce 10-84 at …?
VALVE LOCATIONS
-inform DISPATCHER of valve closures as well as completion of patrol duties
-UPON COMPLETION of the duties, report to COMMAND POST or other assignment directed by IC
Initial actions?
shut down valves-isolate leak and decrease fuel spilled
Primary consideration?
EVACUATION OF AREA INVOLVED
-avenues of escape must remain open for civilians and FD personnel
Strong wind blowing?
all ignition sources in the path of drifting vapors must be extinguished, then all ignition sources in area must be extinguished
Potential for explosion greatest on?
hot/humid/calm days
Dikes may contain spills or divert flow from subways, railroad cuts or tunnels
A. cover unignited pools of gasoline/aviation fuel with foam
B. SOLID ( bluff: fog) hose streams horizontally few inches off ground rapidly side to side..wiping fuel aside..path to rescue
Dept. apparatus no closer than?
600 feet
-Brooklyn Fire dispatcher cannot stop train traffic (bay ridge line)…flag persons 1,000 feet on each side of incident/ ht/flashlight/horizontal motion/4 feet/chest hight
Leak location identified…transmit in preliminary report..?
L.A.T.E L-LOCATION A-AMOUNT T-TOPOGRAPHY E-EXPOSURES
Any unit special called to pipeline box, 9000 series, which does not have the SPECIAL WRENCHES, ASSIGNMENT CARDS AND INSTRUCTION CARDS, ANd Map, shall..?
respond to the quarters of the nearest unit SO EQUIPPED and secure equipment at housewatch are
-ascertain from DISPATCHER the location of this unit
Units with Pipeline control valves in their admin district, shall have them inspected during?
SEMI- ANNUAL HYDRANT INSPECTION
-and during familiarization drills
Needed repairs or recommendations should be the subject of letterhead report to …?
BUCKEYE PIPELINE COORDINATOR
CRITICAL REPAIRS or FLOODED PITS?
IMMEDIATE TELEPHONE NOTIFICATION to Buckeye Pipeline Coordinator