Bid Documents Flashcards
- Which document is submitted to the Owner for bid consideration before the Contractor can receive the bidding documents?
A. Proposal Supplements
B. Instructions to Bidders
C. Noncollusive Affidavit
D. Pre-qualification Forms
D. Pre-qualification Forms
- Which document describes the duties and responsibilities of each party and the business procedures for administering the contract?
A. General Conditions
B. General Requirements
C. Instructions to Bidders
D. Supplementary Conditions
A. General Conditions
- What is the name of the law principle for referring the Contractor to other documents that are not contained in the package provided?
A. Order of Precedence
B. Incorporated by Reference
C. Standardized General Conditions
D. Shop Drawings and Reference Standards
B. Incorporated by Reference
- Which of the following documents is normally incorporated by reference?
A. General Conditions
B. General Requirements
C. Instructions to Bidders
D. Supplementary Conditions
A. General Conditions
- Which document establishes the forms, content and procedures for submitting the bid proposals?
A. General Conditions
B. General Requirements
C. Instructions to Bidders
D. Supplementary Conditions
C. Instructions to Bidders
- Which document makes changes, modifications and corrections prior to bid opening?
A. Addenda
B. Change Directive
C. Proposal Supplements
D. Contract Change Order
A. Addenda
- Which document issued by the Architect illustrates what is to be built?
A. Plans
B. Shop Drawings
C. Product Data Sheets
D. Schematics Drawings
A. Plans
- Which document is submitted by each bidder stating that their bid was arrived at without any conferring with other prime bidders?
A. Proposal Supplements
B. Instructions to Bidders
C. Noncollusive Affidavit
D. Owner/Contractor Agreement
C. Noncollusive Affidavit
- Which document describes quality of work, the quality of the materials, and the construction execution procedures?
A. Agreement
B. General Requirements
C. Technical Specifications
D. Supplementary Conditions
C. Technical Specifications
- Which document applies to the Contractor and the Subcontractors and describes the administrative, procedural and temporary procedures on the job site?
A. General Conditions
B. General Requirements
C. Instructions to Bidders
D. Supplementary Conditions
B. General Requirements
- Which document describes the business procedures for a specific project and changes the initial procedures?
A. General Conditions
B. General Requirements
C. Instructions to Bidders
D. Supplementary Conditions
D. Supplementary Conditions
- Which document requests that additional information be submitted by the bidder within 48 hours of bid opening?
A. Proposal Supplements
B. Instructions to Bidders
C. Noncollusive Affidavit
D. Pre-qualification Forms
A. Proposal Supplements
- Which document establishes the labor rates on a project?
A. General Requirements
B. Instructions to Bidders
C. Proposal Supplements
D. Prevailing Wage Rate Schedule
D. Prevailing Wage Rate Schedule
- What types of projects establish prevailing wage rates?
A. Union projects
B. Merit Shop Projects
C. Privately Funded Projects
D. Federally Funded Projects
D. Federally Funded Projects
- Which document contains a description of the alternate(s)?
A. General Conditions
B. General Requirements
C. Instructions to Bidders
D. Supplementary Conditions
B. General Requirements
- What is the term called which requires all Bidders to include in their bid a specified amount or unit price for a particular item?
A. Plug
B. Alternate
C. Contingency
D. Cash Allowance
D. Cash Allowance
- Which document specifies the existing soil conditions?
A. General Requirements
B. Technical Specifications
C. Supplementary Conditions
D. Information Available to Bidders
D. Information Available to Bidders
- Which document specifies the temporary facilities needed on a project?
A. General Requirements
B. Technical Specifications
C. Supplementary Conditions
D. Information Available to Bidders
A. General Requirements
- Which document specifies the Regulations required such as soil erosion or minorities?
A. General Requirements
B. Technical Specifications
C. Supplementary Conditions
D. Information Available to Bidders
A. General Requirements
- Which of the following documents are submitted by the Contractor at bid opening?
A. Proposal Form, Bid Breakdown, Addendum, Bid Bond & Noncollusive Affidavit
B. Proposal Supplements, Performance Bond, Payment Bond & Insurance Certificate
C. Prequalification Forms, Alternates, Cash Allowances, Prevailing Wages, Deposit
D. Agreement, Regulatory Requirements, Shop Drawings, Product Data & Samples
A. Proposal Form, Bid Breakdown, Addendum, Bid Bond & Noncollusive Affidavit
- Where is the Keyway utilized in a forming system?
A. Placed in the footing horizontally
B. Placed under a load-bearing wall
C. Placed in the vertical concrete joint(s) between pours
D. At the intersection of the concrete wall and the elevated slab
A. Placed in the footing horizontally
- Where is the chamfer strip utilized in a forming system?
A. Attached to the inside face of the formwork to form a texture
B. Placed in the corners of exposed concrete to eliminate sharp edges
C. Placed around the perimeter of an elevated slab to hold the concrete
D. Placed in the exterior corners of the formwork to reinforce the walers
B. Placed in the corners of exposed concrete to eliminate sharp edges
- On a Elevated Slab formwork system, which dimensions do you use to calculate the amount of plyform for the elevated slab?
A. The inside plan lengths and widths added together
B. The outside plan length and outside plan width added together
C. The outside plan length and outside plan width multiplied together
D. The height of the wall and the outside perimeter multiplied together
A. The inside plan lengths and widths added together
- On a Elevated Slab formwork system, which dimensions are used to calculate the total Edge forms?
A. The inside plan lengths and widths added together
B. The outside plan length and outside plan width added together
C. The outside plan length and outside plan width multiplied together
D. The height of the wall and the outside perimeter multiplied together
B. The outside plan length and outside plan width added together