Article 230 (5pg 52q) Flashcards

1
Q

a building or structure shall be supplied by a maximum of _____ service(s), unless specifically permitted otherwise

A

one

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

additional services shall be permitted for a single building or other structure sufficiently large to make two or more services necessary if permitted by _______

A

special permission

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

additional services shall be permitted for different voltages, frequencies, or phases, or for different uses such as for _______

A

different rate schedules

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

where a building or structure is supplied by more than one service, a permanent plaque or directory shall be installed at each service disconnect location denoting all other services supplying that building or structure and the area serves by each

A

TRUE

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

service conductors supplying a building or other structure shall not ______ of another building or other structure

A

pass through the interior

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

conductors are considered outside a building when they are installed

A

-under not less than 2 in of concrete beneath a building or structure

-within a building or structure in a raceway encased in not less than a 2 in. thickness of concrete or brick

-installed in a vault that meets the construction requirements of Article 450

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

-conductors other than service conductors shall not be installed in the same

A

-service raceway
-service cable

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

where a service raceway enters a building or structure from a(n) ________, it shall be sealed in accordance with 300.5(G)

A

underground distribution system

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

service conductors installed as unjacketed multi-conductor cable shall have a minimum clearance of _____ from windows that are designed to be opened, doors, porches, stairs, fire escapes, or similar locations

A

3 feet

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

overhead service conductors to a building shall maintain a vertical clearance of final spans above, or within, _______ measured horizontally from the platforms, projections, or surfaces from which they might be reached.

A

3 feet

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

service conductors shall not be installed beneath openings through which materials may be moved and shall not be installed where they will obstruct entrance to these buildings’ openings

A

TRUE

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

overhead service conductors spans can be supported to hardwood trees

A

FALSE

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

service-drop conductors shall have ___________

A

-sufficient ampacity to carry the load
-adequate mechanical strength

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

the minimum size service-drop conductor permitted is _____ AWG copper or _______ AWG aluminum or copper-clad aluminum

A

8, 6

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

service drops installed over roofs shall have a vertical clearance of _____ above the roof surface, unless a lesser distance is permitted by an exception

A

8 feet

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

if a set of 120/240 V service-drop conductors terminates at a through-the-roof raceway or approved support, with less than 6 feet of these conductors passing over the roof overhand, the minimum clearance above the roof for these service conductors shall be _______.

A

18 inch

17
Q

the requirement to maintain a 3 feet vertical clearance from the edge of a roof does not apply to the final conductor span where the service drop is attached to ______

A

the side of a building

18
Q

service-drop conductors shall have a minimum of _____ vertical clearance from final grade over residential property and driveways, as well as over commercial areas not subject to truck traffic where the voltage is limited to 300 volts-to-ground

A

12 feet

19
Q

the minimum clearance for service-drop conductors not exceeding 60V that pass over commercial areas subject to truck traffic is _________

A

18 feet

20
Q

overhead service-drop conductors shall have a horizontal clearance of ______ from a pool

A

10 feet

21
Q

the minimum point of a attachment of the service-drop conductors to a building shall not be less than _______ above finished grade

A

10 feet

22
Q

where raceay-type service masts are used, all raceway fittings shall be _______ for use with service masts.

A

identified

23
Q

service-lateral conductors shall have_____

A

-adequate mechanical strength
-sufficient ampacity for the loads calculated

24
Q

underground copper service-lateral conductors shall not be smaller than ______ AWG copper

A

4

230.31

25
Q

service-lateral conductors that supply power to limited loads of a single branch circuit shall not be smaller than _________

A

12 AWG copper

26
Q

service-entrance conductors shall be sized not less than _____ percent of the continuous load, plus 100 percent of the noncontinuous load

A

125

27
Q

writing methods permitted for service-entrance conductors include _____

A

-rigid metal conduit
-electrical metallic tubing
-PVC conduit

28
Q

underground service conductors shall be protected against physical damage

A

TRUE

29
Q

service cables, where subject to physical damage, shall be protected by _______

A

-rigid metal conduit

30
Q
A