ALSE Process Guide 85-00-310 Flashcards
AETC, AMTC, SWE
When cementing life rafts, how long must the cement cure with no internal pressure?
Min 48hrs
pg. 2-2
What is not to be used in the cleaning of inflatable equipment ?
Solvents
pg. 2-1
What is the torque for inflation/deflation valves?
25-30 inch pounds
pg. 2-4
How many inches between top of neck and flotation collar back on the LPU-27/PE?
5 inches
pg. 2-21
What are the only authorized airline style passenger life preservers for use on CG fixed wing aircrafts?
AV-35A, AV-35H and FV-35/3505
pg. 2-29
The LRU-25/A crew raft leak test/inspection should be perform at what intervals?
Not to exceed 360 days
pg. 2-32
The 406 PLB operates in what frequency?
121.5MHz also 12 channel GPS receiver and doesn’t float
4-9
What indicates the 406 PLB is transmitting a distress signal?
Red LED flashes every 2 seconds
pg. 4-11
The forward osmosis desalination pouch converts saltwater or contaminated fresh water into a potable energy drink removing _____% of salt in sea water
97%
pg. 4-27
How much time do you have to consume the drink mix?
Within 24hrs
pg. 4-28
You must wait a minimum of _____ hours before consuming the drink mix
8hrs
pg. 4-28
What is the shelf life for the SEAPACK Crew?
5 years
pg. 4-28
How often are oxygen masks overhauls completed?
Every 72 months
pg. 5-8
What is the max water temperature you can wash flight suits?
140F and should be washed inside out
pg. 7-3