Air: 7-9 (Precondition) Flashcards

1
Q

What is Feature 7?

A

Construction Pollution Management

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What type of projects is Feature 7 (Construction Pollution Management) applicable to?

A

All

  • NEB
  • NEI
  • C&S
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Debris; Moisture

What is the context of Feature 7 (Construction Pollution Management)?

A
  • Debris spread by HVAC system
  • Moisture present during construction can be absorbed by building materials and furnishings
  • Health risk of respiratory ailments and other health complications
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

How many parts are there in Feature 7 (Construction Pollution Management)?

A

4

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Duct; Filter; Moisture; Dust

What are the 4 parts of Feature 7 (Construction Pollution Management)?

A
  1. Duct Protection
  2. Filter Replacement
  3. Moisture Absorption Management
  4. Dust Containment and Removal
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

What is the objective of Part 1 (Duct Protection) of Feature 7 (Construction Pollution Management)?

A

Prevent debris from entering the ventilation system

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Either; Sealed; Cleaned

What are the strategies of Part 1 (Duct Protection) of Feature 7 (Construction Pollution Management)?

A

​Either

  • Sealed and protected during storage, during installation and after installation
  • Cleaned before installation
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

What is the objective of Part 2 (Filter Replacement) of Feature 7 (Construction Pollution Management)?

A

Clean filters ensure efficiency

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

What is the strategy of Part 2 (Filter Replacement) of Feature 7 (Construction Pollution Management)?

A

Replacement before occupancy

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

What is the objective of Part 3 (Moisture Absorption Management) of Feature 7 (Construction Pollution Management)?

A

Prevent materials and products from absorbing moisture during construction.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Separate; Store

What is the strategy for Part 3 (Moisture Absorption Management) of Feature 7 (Construction Pollution Management)?

A

A designated separate area to store and protect absorptive materials or products.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

What is the objective of Part 4 (Dust Containment and Removal) of Feature 7 (Construction Pollution Management)?

A

Containment of dust and debris during construction

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Physical; Mats; Guards

What are the strategies of Part 4 (Dust Containment and Removal) of Feature 7 (Construction Pollution Management)?

A

The construction that occurs a year before performance verification

  • Physical separation of active construction spaces
    • Sealing of openings
    • Installation of temporary barriers
  • Walk-off mats at entryways
  • Power tools have guards or collectors to capture generated dust
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

What is Feature 8?

A

Healthy Entrance

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

As a precondition, what building types are Feature 8 (Healthy Entrance) applicable to?

A
  • NEB
  • C&S
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

As an optimisation, what building type is Feature 8 (Healthy Entrance) applicable to?

A

NEI

17
Q

What is the intent of Feature 8 (Healthy Entrance)?

A

Limiting amount of outdoor contaminants entering via air or soles of occupants’ shoes

18
Q

How many parts are there in Feature 8 (Healthy Entrance)?

A

2

19
Q

What are the 2 parts of Feature 8 (Healthy Entrance)?

A
  1. Entryway Walk-Off Systems
  2. Entryway Air Seal
20
Q

Part 1 (Entryway Walk-off Systems) of Feature 8 (Healthy Entrance) applies to ______ building entrances.

A

regularly used

21
Q

What are the strategies of Part 1 (Entryway Walk-off Systems) of Feature 8 (Healthy Entrance)?

A
  1. Permanent entryway system (grilles, gates or slots)
  2. Rollout mats
  3. Manufactured product
22
Q

What are the specifications for strategies of Part 1 (Entryway Walk-off Systems) for Feature 8 (Healthy Entrance)?

A
  1. Maintained on a weekly basis
  2. As wide as entrance width
  3. Minimum 3m / 10ft
23
Q

What is the objective of Part 2 (Entryway Air Seal) of Feature 8 (Healthy Entrance)?

A

Limit movement of air from outdoors to indoors within HVAC entrances

24
Q

What are the strategies of Part 2 (Entryway Air Seal) of Feature 8 (Healthy Entrance)?

A
  1. Entry vestibule with 2 normally closed doorways
  2. Revolving entrance doors
  3. Min. 3 normally shut doors separating occupied spaces from outside
25
Q

What is Feature 9?

A

Cleaning Protocol

26
Q

As a precondition, what project types is Feature 9 (Cleaning Protocol) applicable to?

A
  • NEB
  • NEI
27
Q

Daily use; Surfaces

What is the context for Feature 9 (Cleaning Protocol)?

A

Daily use leaves debris, pathogens and allergens on surfaces.

28
Q

Surfaces; Cleaning; Products; Approved

What is the intent of Feature 9 (Cleaning Protocol)?

A

Addressing which surfaces are to be cleaned and what cleaning products are approved for use.

29
Q

How many parts are there in Feature 9 (Cleaning Protocol)?

A

1

30
Q

What is the part of Feature 9 (Cleaning Protocol)?

A

Cleaning Plan for Occupied Spaces

31
Q

Table; Appendix

Generally, what is the specification for the part (Cleaning Plan for Occupied Spaces) of Feature 9 (Cleaning Protocol)?

A

Table A4 in Appendix C

32
Q

Plan; List; Schedule; Log

What are the strategies for the part (Cleaning Plan for Occupied Spaces) of Feature 9 (Cleaning Protocol)?

A
  1. Cleaning plan (Cleaning Equipment and Training section)
  2. List of approved product seals (Cleaning, Disinfection and Hand Hygiene Product section)
  3. List of high-touch surfaces and a schedule of sanitisation and disinfection (Disinfection and Sanitisation section)
  4. Cleaning schedule (including Entryway Maintenance section)
  5. Dated, maintained logs available to all occupants
33
Q

What are Features 7, 8 and 9?

A
  • Feature 7 = Construction Pollution Management
  • Feature 8 = Healthy Entrance
  • Feature 9 = Cleaning Protocol