Air: 13-15 (Optimisation) Flashcards

1
Q

What is Feature 13?

A

Air Flush

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What project types (NEB, NEI, C&S) does Feature 13 apply to?

*Air Flush

A

All

  • NEB
  • NEI
  • C&S
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What is the objective of air flushing?

A

Removal or reduction of airborne contaminants or pollutants by running HVAC for extended periods of time after construction and before occupancy.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What are the specifications for Interior Temperature and Humidity for Feature 13?

*Air Flush

A
  • Interior Temperature = Min. 15*
  • Humidity = 60%
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

What are the strategies for Feature 13?

*Air Flush

A
  • Entire Air Flush
  • 2-Part Air Flush (Before, After)
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

What are the specifications for an Entire Air Flush for Feature 13?

*Air Flush

A

14,000 ft3 / ft2;

4,266 m3 / m2

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What are the specifications for a 2-Part Air Flush before Occupancy for Feature 13?

*Air Flush

A

3,500 ft3/f2;
1,066 m3/m2

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

What are the specifications for a 2-Part Air Flush after Occupancy for Feature 13?

*Air Flush

A

10,500 ft3 / ft2;

3,200 m3/m2

+ Ventilation System provides (0.1 m3 / min) / m2

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

What is Feature 14?

A

Air Infiltration Management

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

What project types (NEB, NEI, C&S) does Feature 14 apply to?

*Air Infiltration Management

A

All

  • NEB
  • NEI
  • C&S
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Condensation

Why is Feature 14 essential?

*Air Infiltration Management

A

Air Infiltration and Exfiltration can result in condensation that leads to material damage or the development of mold.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

“Only performed after…”; Commissioning; Plan

What are the 2 strategies for Part 1 of Feature 14?

  • *Air Leakage Testing*
  • *Air Infiltration Management*
A
  • Building Envelope Commissioning
  • Plan for Action and Remediation
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

What are the guidelines of reference for Building Envelope Commissioning of Feature 14?

*Air Infiltration Management

A
  • ASHRAE Guideline 0-2005
  • NIBS Guideline 3-2012
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

What is Feature 15?

A

Increased Ventilation

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

What project types (NEB, NEI, C&S) does Feature 15 apply to?

*Increased Ventilation

A

All

  • NEB
  • NEI
  • C&S
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

Ventilation rates; CIBSE

What are the strategies for the sole part of Feature 15?

  • *Increased Outdoor Air Supply*
  • *Increased Ventilation*
A
  • Ventilation supply rates exceed ventilation rates of Part 1A of Feature 3 (Ventilation Effectiveness) by 30%
  • Follow CIBSE AM 10, Section 4 to predict room-by-room air flows providing effective natural ventilation
17
Q

What are Features 13, 14 and 15?

A
  • Feature 13 = Air Flush
  • Feature 14 = Air Infiltration Management
  • Feature 15 = Increased Ventilation