What is Feature 13?
Air Flush
What project types (NEB, NEI, C&S) does Feature 13 apply to?
*Air Flush
All
- NEB
- NEI
- C&S
What is the objective of air flushing?
Removal or reduction of airborne contaminants or pollutants by running HVAC for extended periods of time after construction and before occupancy.
What are the specifications for Interior Temperature and Humidity for Feature 13?
*Air Flush
- Interior Temperature = Min. 15*
- Humidity = 60%
What are the strategies for Feature 13?
*Air Flush
- Entire Air Flush
- 2-Part Air Flush (Before, After)
What are the specifications for an Entire Air Flush for Feature 13?
*Air Flush
14,000 ft3 / ft2;
4,266 m3 / m2
What are the specifications for a 2-Part Air Flush before Occupancy for Feature 13?
*Air Flush
3,500 ft3/f2;
1,066 m3/m2
What are the specifications for a 2-Part Air Flush after Occupancy for Feature 13?
*Air Flush
10,500 ft3 / ft2;
3,200 m3/m2
+ Ventilation System provides (0.1 m3 / min) / m2
What is Feature 14?
Air Infiltration Management
What project types (NEB, NEI, C&S) does Feature 14 apply to?
*Air Infiltration Management
All
- NEB
- NEI
- C&S
Condensation
Why is Feature 14 essential?
*Air Infiltration Management
Air Infiltration and Exfiltration can result in condensation that leads to material damage or the development of mold.
“Only performed after…”; Commissioning; Plan
What are the 2 strategies for Part 1 of Feature 14?
- *Air Leakage Testing*
- *Air Infiltration Management*
- Building Envelope Commissioning
- Plan for Action and Remediation
What are the guidelines of reference for Building Envelope Commissioning of Feature 14?
*Air Infiltration Management
- ASHRAE Guideline 0-2005
- NIBS Guideline 3-2012
What is Feature 15?
Increased Ventilation
What project types (NEB, NEI, C&S) does Feature 15 apply to?
*Increased Ventilation
All
- NEB
- NEI
- C&S