All plumbing plans, drawings, diagrams, design, analyses/computations, technical specifications, BOM and other shall be signed and sealed by an RLMP and shall be submitted in ___ sets.

A. 2
B. 4
C. 7
D. 6

A

D. 6

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

A permit used for construction of a part of a large and/or complicated plumbing system before the entire plans and specs for the whole system have been submitted or approved

A

PARTIAL PERMIT

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

How many plans should be retained by OBo?

A. 1set
B. 2 sets
C. 3 sets
D. None of the above

A

A. 1 set

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

How many set of plans should be retained by applicant?

A. 1 set
B. 2 sets
C. 3 sets
D. None of the abive

A

B. 2 sets

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

How many set of plans should be retained by owner?

A. 1 set
B. 2 sets
C. 3 sets
D. None of the above

A

B. 2 sets

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

How many set of plans should be kept at jobsite at all times?

A. 1 set
B. 2 sets
C. 3 sets
D. None of the above

A

A. 1 set

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

How long shall the plumbing permit expire?

A. 120 days
B. 4 months
C. 1 year
D. 60 days

A

C. 1 year

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

How long shall permit be null and void if plumbing work has been suspended or abandoned?

A. 120 days
B. 5 months
C. 1 year
D. 60 days

A

A. 120 days

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

How much should be paid for the renewal of plumbing permit?

A. 25% of original fee
B. 50% of original fee
C. 75% of original fee
D. 100% of original fee

A

B. 50% of original fee

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Who is the designated agent responsible for the maintenance of the plumbing system?

A. Administrative Authority
B. Applicant
C. Owner
D. RMP

A

C. Owner

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Operation or use of any plumbing accessory installed to replace existing equipment or fixtures serving an occupied portion of the bldg is allowed when a request for inspection of such equipment or fixtures has been filed with the Administrative Authority not more than ____ after such replacement work is completed and before any portion of such plumbing system is concealed by any permanent portion of the bldg

A

72 hrs

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Every request for inspection be filed at least ____ before such inspection in intended

A

3 working days

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

No ____ connections to any water supply line, sewer or storm rain until approved by the Administrative Authority

A

Permanent

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

Administrative Authority will endorse to other authorities or gov agency the issuance of _____ of the plumbing equipment to the water supply main, sewer main, popwer line and gas main for the purpose of testing the equipment

A

Temporary connections

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

Seal shall be in _____ shape

A

Round

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

Where is the ‘Registered and Licensed Master Plumber’ located in the seal?

A. Upper center
B. Upper portion
C. Center below the name
D. Lower portion

A

B. Upper portion

17
Q

Where is the ‘Name of the RLMP’ located in the seal?

A. Upper center
B. Upper portion
C. Center below the name
D. Lower portion

A

A. Upper center

18
Q

Where is the ‘registration number’ located in the seal?

A. Upper center
B. Upper portion
C. Center below the name
D. Lower portion

A

C. Center below the name

19
Q

Where is the ‘Philippines’ located in the seal?

A. Upper center
B. Upper portion
C. Center below the name
D. Lower portion

A

D. Lower portion