All plumbing plans, drawings, diagrams, design, analyses/computations, technical specifications, BOM and other shall be signed and sealed by an RLMP and shall be submitted in ___ sets.
A. 2
B. 4
C. 7
D. 6
D. 6
A permit used for construction of a part of a large and/or complicated plumbing system before the entire plans and specs for the whole system have been submitted or approved
PARTIAL PERMIT
How many plans should be retained by OBo?
A. 1set
B. 2 sets
C. 3 sets
D. None of the above
A. 1 set
How many set of plans should be retained by applicant?
A. 1 set
B. 2 sets
C. 3 sets
D. None of the abive
B. 2 sets
How many set of plans should be retained by owner?
A. 1 set
B. 2 sets
C. 3 sets
D. None of the above
B. 2 sets
How many set of plans should be kept at jobsite at all times?
A. 1 set
B. 2 sets
C. 3 sets
D. None of the above
A. 1 set
How long shall the plumbing permit expire?
A. 120 days
B. 4 months
C. 1 year
D. 60 days
C. 1 year
How long shall permit be null and void if plumbing work has been suspended or abandoned?
A. 120 days
B. 5 months
C. 1 year
D. 60 days
A. 120 days
How much should be paid for the renewal of plumbing permit?
A. 25% of original fee
B. 50% of original fee
C. 75% of original fee
D. 100% of original fee
B. 50% of original fee
Who is the designated agent responsible for the maintenance of the plumbing system?
A. Administrative Authority
B. Applicant
C. Owner
D. RMP
C. Owner
Operation or use of any plumbing accessory installed to replace existing equipment or fixtures serving an occupied portion of the bldg is allowed when a request for inspection of such equipment or fixtures has been filed with the Administrative Authority not more than ____ after such replacement work is completed and before any portion of such plumbing system is concealed by any permanent portion of the bldg
72 hrs
Every request for inspection be filed at least ____ before such inspection in intended
3 working days
No ____ connections to any water supply line, sewer or storm rain until approved by the Administrative Authority
Permanent
Administrative Authority will endorse to other authorities or gov agency the issuance of _____ of the plumbing equipment to the water supply main, sewer main, popwer line and gas main for the purpose of testing the equipment
Temporary connections
Seal shall be in _____ shape
Round