A6 Flashcards
Summarise project
- Significance
- Size (Full and D2D)
- location
- Aim
- Context
Regionally significant Infrastructure
Full scheme - connect Londonderry and Belfast - 50km
Split into sections
Phase 2 = D2D
25.5km stretch of single carriageway to dual.
RDS 2035 NI - Key transport corridor.
Project value ?
full scheme - £420m
Project value - D2D ?
£220m
Construction programme ?
April 2018 to Spring 2022 (4 years)
Client?
DFI
NI gov department
provide & maintain public roads
Funding?
DFI - Public money
approved by NI executive in 2016 budget
and EU transport division
Site Context?
Largely agricultural
Regional LCA (2015)= North Sperrin Hills and Valleys
Landscape Designation: Sperrin Mts
- AONB (UK)
- A Nature conservation and Amenity Lands Order
- Unique beauty, management plans (between LA & landowner)
- funding DAERA
Ecological Designation: River Roe & River Faughan
Roe / Faughan
- SAC / candidate SAC (Euro)
- Habitats Directive: Annex 1 = habitats, Annex 2 = species
- Management plan, appropriate assesment
- Funding EU + Rural Development Fund + NIEA
Faughan
- ASSI (NI/UK)
- Environ Order & WANE Act
- Wildlife and geology
- Favourable condition, NOs, Management agreements (NIEA & landowner)
Procurement route?
Design and Build
AECOM appointment
- how we won it?
- work stage?
- contract?
- Fee?
DfI Major Works Framework (4 years)
= 6 consultants, take turns for major works packages.
- initial tender was QUALITY + FEE
AECOM prepared Specimen design for DFI
RIBA 5 - construction management
Client representative
NEC PSC Opt E - Cost Reimbursable (Time Charge)
- poor scope
fee agreed annually, monthly forecasts prepared.
EWs & CEs (under the contract) if we need more
£120,000 3 of 4 yrs
(notes on timecard very important - random audits from client)
Construction tender method ?
Open - Advertised
Public Contracts Regs 2015
OJEU (4.7m)
Contractor appointment?
Joint Venture - sahheer (int infra con) - Wills (irish CEng con), - Somag (portugese con) Design consultant - Roughan O'Donovan (Irish CEng, Struct consultant)
Contract - NEC ECC Opt C - TC + AS
(AS used as design not detailed enough to prepare BoQ)
AS = paid after tasks complete - don’t have to measure kms of work - would have to with BoQ
My role
Softworks inspections & reports.
Review of contractors proposals - integrity of design
Relevant Legislation
- Public contracts
- EIA
- Designations
PC Directive 2014 > PC Regulations 2015 - principals of procurement Town and Country Planning (Environmental Impact Assessment) Regulations 2017 - Schedule 1/2 The Planning EIA Regulations NI 2017 - process for EIA
Nature Conservation and Amenity Lands (Northern Ireland) Order 1985
- AONB designation
Conservation (Natural Habitats, etc.) Regulations (Northern Ireland) 1995
- SAC designation
Code of Conduct
9 - care, conscientiously and regard to proff stds
- impartial and independent advice
- reviewing contractors proposals (drawings and on site)
How did you assess the Softworks
- documents
- Health
- Imports compliance?
Drawings, proposed and mitigation from EIA.
Highways Specification
- guidance and appendices
Employers requirements
If planted - location and mix
Size v spec - height/girth -tag colour
potting v spec
Specis v spec
form v spec
Scratch bark - moist, frost damage, dry
Plant passport
Tree guards, stakes