6.1 Schematic Design Flashcards
1
Q
What is the information required before schematic design?
A
Client- provide functional programming site, documentation surveys, zoning, considerations, and report on site conditions.
Architect- procure missing information to be billed as additional services
2
Q
What are the documents required for client sign off and approval of schematic design?
A
Drawings: Site plans, block plans, sections, elevations, massing diagrams, conceptual sketches.
Sch. design report : design philosophy, sustainability, probable costs, code review, schedules