3M 301 TEST Flashcards
What are the weekly tasks a work center supervisor must do with their respective division officer in accordance with the 4790.1D?
Initial and sign the 13 week file and review the CSMP
When the X is used to mark off a maintenance check as complete. What must be done by the work center supervisor to complete this process?
Create a flip page with who did the check and when, to include JSN
When a work center supervisor authorizes a substitute for a tool, they must ensure the tool can __ the step and __
complete, safely
A sample page of signatures and initials shall be filed in the WC maintenance manual.
True
When the work center supervisor signs the change page it indicates what?
All PMS documents have been reviewed, validated and installed for FR
If an inspection criteria or thresholds inspected by the MRC do not meet the intended criteria. Then those maintenance actions can not be signed off as completed until the __.
Discrepancies are corrected
Who is responsible for scheduling weekly work center maintenance and supervising its proper accomplishment?
Work center supervisor
During an FR the WCS arranges the quarterly schedule using the __ schedule as a reference.
Cycle
When a maintenance person(MP) is conducting PMS they must verify what information on an EGL when they get to the equipment?
MRC SYSCOM, MIL SPEC and periodicity
What is the reference used to determine the proper PPE for each HAZMAT?
MSDS
When equipment has been designated to be placed in IEM Status II which of the following conditions must be applied?
Equipment that is inactive for thirty days or longer and is directly subject to corrective maintenance, overhaul or removal for safe storage/replacement
The use of MIP scheduling aids are __.
used to verify what maintenance requirements are applicable to the work center
The PMS forecast report can be used to __
assist HICS in ordering HAZMAT for the quarter
HAZMAT is disposed of IAW __
GWINST 4110.1B
Which reference is the TYCOM Maintenance and Material Management Manual?
COMNAVAIRFORINST 4790.1D
Periodic maintenance actions are accomplished on a recurring basis during __.
inactive period to prevent equipment deterioration
Where are the detailed reasons recorded, by the work center supervisor. For non-accomplishment of scheduled PMS?
13 week accountability Log
A maintenance requirement that is satisfied by a higher level test is recorded using what symbol?
c
A part can not be ordered unless the work center responsible __.
opens a work candidate
When in a revision mode and installing the Force Revision. Changes to the PMS schedule will be first seen after __.
The Department Head had finalized the Revision
In accordance with the 4790.1D, how often is the CSMP reviewed by the DIVO and WCS?
Weekly
If a work Candidate is to be written for a shipyard or a contractor to accomplish. What should be on the “Maintenance Level” block?
Depot
Information on resolving a dual periodicity can be found on which items from the list below: 1.MRC 2.MIP 3.R-Check Scheduling Aid 4.PMS Service Brief
1, 2 and 3
Who is required to sign the second check on a SOMS tag out?
The second petty officer in charge