202.16 SGBD Flashcards

1
Q
  • 202.16 SGBD*
    • *

Functions of SGBD

A

Maintain secondary side water chemistry w/in specs

Prevent the buildup of corrosion products

Reduce SG radioactivity levels

Provide the means of draining the SG secondary side, and

Maintain the correct environment during system wet lay-up and drained conditions

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q
  • 202.16 SGBD*
    • *

SGBD Nozzle

A

~2 inch welded nozzle used to connect Blowdown piping to SG(s)

Connected to perforated “Sparger Pipe” to direct flow

Penetrates SG just above the tube sheet

After flow exits nozzle, pipe size is ~4 inches

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q
  • 202.16 SGBD*
    • *

Hi-Flow Blowdown Valve

A

Also called Augmentation Flow Control Valve

May be used to raise flow after the continuous flow limit is reached on Main Blowdown Nozzle.

4 remotely operated AOV’s (1 per each S/G)

2” pneumatically operated valve

Draws water from Downcomer Region of SG

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q
  • 202.16 SGBD*
    • *

Blowdown Isolation Valves

A

Provides remote manual/automatic blowdown flow isolation from it’s respective SG

4 remotely operated AOV’s - one for each SG

4” pneumatically operated isolation valve

Located in 21’ IVC above respective AFW Pump against south wall

Operated from MCR

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q
  • 202.16 SGBD*
    • *

Blowdown Flow Control Valves

A

Used to control total blowdown flow from SG

4 remotely operated AOV’s - one per SG

3” pneumatically operated valve

Located in 10’ IVC near respective AFW Pump, just inside water-tight door, on west wall

Operated from MCR CP-018

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q
  • 202.16 SGBD*
    • *

Flash Tank

A

Used to receive blowdown flow and provide the first level of heat recovery in the system.

(~ 30% of the flow flashes to steam as it enters the tank.)

Provides necessary Head to prevent flashing between the Flash Tank and Heat Exchangers

Located in 55’ TGB South-Central mezzanine, east of SGBD Heat Exchangers

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q
  • 202.16 SGBD*
    • *

Regenerative Heat Exchangers

A

Used to recover heat and reduce the temperature of the blowdown to ~165°F with the demins bypassed by regulating condensate flow (120°F with the demins in service)

Shell and U-Tube HX

Located in 55’ TGB (south-central)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q
  • 202.16 SGBD*
    • *

Prefilters

A

Used to remove particulate matter from blowdown fluid to extend the life of the demineralizer resins

Two filters in parallel (original 25 micron)

Design Change allows any size or dummy filter to be installed

Normally the dummy filter is installed

Located 33’ MAB SGBD area (Old Truck Bay) south side in individual cubicles

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q
  • 202.16 SGBD*
    • *

Demineralizers

A

Used to process SGBD for return to the Condensate System by removal of:

Suspended particulate

Corrosion Products

Dissolved Ionic Impurities

Radioactive Contaminants (Primary-to-Secondary Leak)

2 Mixed-Bed Demins normally in series

Located 33’ MAB SGBD area SW corner in separate elevated cubicles

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q
  • 202.16 SGBD*
    • *

Recirculation Pumps

A

Used to recirculate water in SG during wet lay-up

4 pumps - one per SG

Single stage, horizontal, motor driven centrifugal pumps

Oil lubricated bearing between pump and motor

History has shown oil leaks are frequent

Located 10’ IVC directly across from respective AFW Pump Cubicles (outside water tight area

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q
  • 202.16 SGBD*
    • *

Radiation Detectors

A

5 Radiation Monitors - 1 offline (RT-8043) and 4 adjacent to line

•Offline Monitor (RT-8043)

Measures the concentration of gamma producing nuclides to ensure that effluent levels are not exceeded

Used to prevent discharge of contaminated SGBD to Neutralization Basin and to determine demineralizer efficiency and depletion

May be aligned to Pre-filter Influent or Demineralizer Effluent

Located 41’ MAB Solid Waste Handling Area

•Adjacent to Line Monitors

Used to detect Primary-to-Secondary Leakage

4 monitors - one for each SG

Detectors in IVC between Containment Penetration & Containment Isolation Valve

RM-80(s) located in penetration space of EAB

SGBD A and SGBD C = 60’ EAB (A)8022, (C)8024

SGBD B and SGBD D = 10’ EAB (B)8023, (D)8025

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q
  • 202.16 SGBD*
    • *

Signals that will cause automatic blowdown isolation

A

•4 signals will cause an Automatic Closure

SG LO-LO level (2 of 4 in any SG)

SI Auto initiation signal

AMSAC initiation signal

Reactor Trip (P-4) when Source Range is blocked

  • allows the actuation if you are at power since source ranges would be blocked
  • also prevents the isolation while shutdown
How well did you know this?
1
Not at all
2
3
4
5
Perfectly