Functions of 480V Non-Class 1E Electrical Dist. System
Provides reliable AC power to balance of plant 480V loads
- 201.32 Non-Class 480*
- *
Functions of a Load Center (LC).
Electrical distribution supply points for motors >= 100 HP, static loads >= 100 KW, and Motor Control Centers (MCC)
- 201.32 Non-Class 480*
- *
What is a double-ended Load Center?
Two separate transformers ,supply two separate buses, which can be connected with a cross-tie breaker. Each end normally supplied from separate Aux buses.
- 201.32 Non-Class 480*
- *
Interlock for Double-ended LCs
To prevent inadvertent paralleling of buses that could be powered from different offsite AC sources, only two of the three breakers (2 feeder, 1 X-tie) can be closed at a time.
- 201.32 Non-Class 480*
- *
What is a single ended load center?
One transformer feeds the LC.
(1N, 1P, 1R, 1S, 1T, 12L, and 1W)
- 201.32 Non-Class 480*
- *
Function of Motor Control Center
Power distribution point for motors of less than 100 HP and static loads 100 KW or less.
Exception is IA Compressor 14(24). 200 HP powered from 1(2)G5. Has soft start to limit current.
Magnetic trip elements and thermal overloads
- 201.32 Non-Class 480*
- *
Which Non-Class MCCs are fed from Class-1E MCCs?
1A5, 1B5, 1C5.
NOT safety-related, but supply safety-related support systems.They are shed during emergencies by the sequencer.
- 201.32 Non-Class 480*
- *
Function of 208/120 VAC Distribution Panels (DPs)
Located at MCC’s as well as throughout the plant Typical Loads: Space heaters, AFW sample pump, Cold Chem Lab toilet exhaust fan
- 201.32 Non-Class 480*
- *
Selective Tripping
Isolate branch circuit breaker closest to fault first.
Load supply breaker should trip first protecting MCC. If it fails to trip, then MCC feeder breaker would be next to trip
- 201.32 Non-Class 480*
- *
How are 480 V LC transformers cooled?
Forced air from fans. Inside transformers are dry, outside are oil filled.
Local amber light when fan is running
- 201.32 Non-Class 480*
- *
What are the MCCs that are diesel backed and where are they located?
1G5 - SE TGB 29’ (actually 31’)
12K3 - south yard, next to LTG Diesel Bldg
1G8 - EAB penthouse 83’
- 201.32 Non-Class 480*
- *
Which LC is diesel backed and where is it located?
LC 1W - EAB penthouse 83’
- 201.32 Non-Class 480*
- *
Normal and Emergency power for MCC 1G5
LC 1U
BOP Diesel
- 201.32 Non-Class 480*
- *
Normal and Emergency power for MCC 1G8
LC 1W
TSC Diesel
- 201.32 Non-Class 480*
- *
Normal and Emergency power for 12K3
LC 12L
LTG Diesel
- 201.32 Non-Class 480*
- *
BOP Diesel Generator Electrical Ratings
700 KW
480 V
- 201.32 Non-Class 480*
- *
LTG Diesel Generator Electrical Ratings
700 KW
480 V
- 201.32 Non-Class 480*
- *
TSC Diesel Generator Electrical Ratings
1200 KW
4160 V
- 201.32 Non-Class 480*
- *
Automatic start for BOP diesel
UV on MCC 1G5, will start and load w/in 15 secs (unless feeder tripped on over current to prevent energizing a faulted bus)
- 201.32 Non-Class 480*
- *
Automatic start for LTG Diesel
UV on MCC 12K3, will start and load w/in 15 secs (unless feeder tripped on over current to prevent energizing a faulted bus)
- 201.32 Non-Class 480*
- *
Automatic start on TSC Diesel
UV on LC 1W , will start and load w/in 15 secs (unless feeder tripped on over current to prevent energizing a faulted bus)
- 201.32 Non-Class 480*
- *
Source of control power for LCs
125 VDC control power
- 201.32 Non-Class 480*
- *
Source of control power for MCCs
Small transfomer downstream of each load breaker inside cubicle provides 125 VAC control power
- 201.32 Non-Class 480*
- *
Causes for “480V LC Trouble”
CP010
Bus Ground Fault (except 12H)
Bus Undervoltage
Feeder breaker status (breaker alignment abnormal)
Transformer high temperature