12. Air/Light Operations (pt 1) Flashcards
1
Q
How to set up the air compressor?
A
- Cab: Parking brake, neutral, turn on generator (do not put in drive)
- CO monitor will countdown from 120 seconds
- Fully raise compressor doors (all the way or will not trip sensor) and rear door
- Turn on compressor (will not activate if air is above 5500)
2
Q
How to engage the light tower?
A
- Ensure generator is on
- Breaker should have been left on, check if light does not come on
- On remote control box hold down green power button for approx. 2-3 seconds until it turns on
- Check for overhead obstructions
- Can raise; push up button twice
- Turn lights on
3
Q
How to disengage the light tower?
A
- Turn lights off
- Allow time to cool
- Lower light tower (To automatically stow the light tower press the down arrow twice)
4
Q
How to engage/disengage scene lights?
A
- Ensure proper breaker/fuse box is on to engage lights
- Driver side scene lights switch is overhead in cab
- Passenger side scene lights switch is overhead in cab
- Rear scene lights switch can be operated from overhead in cab or rear of apparatus
- Turn power off at breaker/fuse box
5
Q
How to Fill SCBA Bottles (DO NOT RELEIVE THE REGULATOR, KEEP AT 4500PSI)? (pt 1)
A
- Open bank 1, 2, 3, OR 4 (Only open one bank at a time)
- Pressure regulator is to be always left at 4500PSI, DO NOT RELIEVE THE REGULATOR AFTER USE.
- Connect SCBA Bottle [Scott SCBA bottles DO NOT open valve on bottle ]
- Open fill valve(s) Left/Right for appropriate bottle(s) 1 or 2 until full
- Open fill station door Left/Right (notice that we did not close fill valves)
6
Q
How to Fill SCBA Bottles (DO NOT RELEIVE THE REGULATOR, KEEP AT 4500PSI)? (pt 2)
A
- Close fill station valve(s) When done filling all bottles)
- (On new, will bleed down automatically) Set inlet pressure regulator back to zero when filling operations are complete
- Ensure all valves are closed
- Ensure compressor is full prior to shutting down (Compressor will automatically shut down when it reaches 6000psi)
7
Q
What do I do if I am filling an MSA bottle?
A
- If Filling MSA bottles use Adapter (Located Captain front compartment, Tool box)
- MSA SCBA bottles need to have valve open and closed when filling
8
Q
With air/light unit, what must be done before departing scene?
A
- ensure all air banks are full