1. Fire Scene (pt 5) Flashcards
1
Q
How to conduct a deck gun reset
A
- FF1 to crows nest and calls for water when ready as FF2 pulls preconnect;
- Engineer deploys deck gun, opens when water is called; set to preset (95psi) and pull valve halfway out
- quickly checks that the preconnect is deployed and ready for water;
- comes back and shuts down when called for, while simultaneously opening preconnect, and set pressure;
- then begin working on a supply;