1-2: DCA Roles & Responsibilities Flashcards
Who is the DCO onboard a cutter?
EO
Who is the chairman of the In-port DCTT?
DCA
What is an MOU / MOA used for?
Agreement to have local fire dept. respond in case of emergency normally so cutter can have smaller duty sections
What is the WQSB?
Large document that assigns personnel to all cutter bills and conditions
What is the difference between a critical and non-critical weld?
Critical welds, upon failure, can cause serious harm or death to personnel as well as large scale damage to structures or equipment. Non-critical welds will not cause severe injury or damage if they fail
After deviating from specs, how long before work must begin to get back to configuration?
14 days
What are the 3 parts of the DC Closure Log?
Violations of Material Condition, INOP fitting log, locked fitting log
When is a “Deviation from Specs” authorized?
only when in an emergency situations; notification should be sent to product line four hours before commencing work
When a fitting is OOC during an availability where should it be logged?
INOP fitting log