Works progress and quality management L1 Flashcards

Works progress and quality management L1

1
Q

What is required to carry out a site inspection and the importance of recording progress of works?

A

A

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Tell me about your knowledge of the requirements of recording progress?

A

A

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Tell me about your knowledge of the requirement for quality descriptors as set out in the contract documentation?

A

A

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Tell me about your understanding of the differences between the duties of a CA and those of a person appointed solely to report on progress and quality issues?

A

A

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

What tools or methods can you use to determine site progress? Can these be used as a measure against the programme?

A

A

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

What would you do if a project is behind schedule? What type of dispute might arise?

A

A

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What is an extension of time request? How would you deal with one?

A

A

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

How would you use the specification to gain an understanding of the works and their quality/finish? What advice might you give as a result?

A

A

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Talk me through your understanding of Surveying Safely in relation to works monitoring.

A

A

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Why is it important to monitor works progress?

A

A

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Can you give 2 examples of where you would need to have a practical example of the finish required?

A

A

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

There are some elements of work where an inspection on site will not reveal if the specification has been met. Give 2 examples where you may need additional tests how you determine the quality.

A

A

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

When carrying out an inspection of work on site list 3 items preparation you should do?

A

A

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

Name 3 of the principles given in McGlinn v Waltham Contractors for inspection work.

A

A

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

Name 3 methods of assessing progress that you could use.

A

A

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

Which of these methods is best suited to a simple single task of short duration i.e. installation of new patio at a house?

17
Q

Is the critical path useful when monitoring progress?

18
Q

Name 3 methods of assessing progress that you could use.

19
Q

Which of these methods is best suited to a simple single task of short duration i.e. installation of new patio at a house?

20
Q

Is the critical path useful when monitoring progress?

21
Q

BS 8500–2 has two requirements for producers of Ready Mixed Concrete - what are they?

22
Q

When reporting to your client on delays to works progress what would you report as being valid reason for the delay?

23
Q

What legal guidance is there for when building works should be inspected at what frequency and what should be looked at?

24
Q

What is the difference between a CA and Clerk of Works?

25
On work such as brickwork decoration how can you initially ensure that the quality of the work is going to be satisfactory?
A
26
In the case of JCT minor works where the contractors programme is not necessarily as a contract document how do you monitor progress?
A
27
What headings do you use when setting out your progress reports for your clients?
A
28
What are some examples of important documentation required to capture information on progress and quality?
A
29
For new build homes what Code could be adopted in relation to construction quality?
A
30
Explain the requirements of the New Homes Quality Code.
A
31
Who can be a Pre-Completion Inspector?
A
32
What does a Pre-Completion Inspection include?
A
33
What format does a Pre-Completion Inspection take?
A
34
At what stage is a Pre-Completion Inspection carried out?
A