W/C, P/C, Q/A Flashcards
BCM1
Repair not authorized
BCM 2
Lack of tools
BCM 3
Lack of skills
BCM 4
Lack of parts
BCM 5
Fails test and check
BCM 6
Lack of data/pub
BCM 7
Beyond repair
BCM 8
Administrative (over cost)
BCM 9
Condemned
Type of maintenance that requires hours, calendar, periods.
Scheduled maintenance
What program does QA NOT manage
Tool control program
What program is not monitored by QA
Ordnance loading/ handling safety
Who gets the Vids MAF copy 1
Work Center
Who gets Copy 3 of Vids MAF
PC
Production control is directly responsible to what officer for the overall production effort
The maintenance material control officer
ICRL code C1
Full repair
ICRL code C3
Limited repair
ICRL code A1
Test and check only
ICRL code X1
Repair not authorized
Job status code M3
Awaiting maintenance on backlog
Job status M8
Awaiting other shops
Job status WB
In transit from awp to shop
Welcome back
Job status WP
Awp In Shop
Job status WQ
Awp in awp locker
Job status WT
In transit to awp locker
what factors determine the number of personnel assigned to a QA division
size of the unit and number of work shifts
It is a work center supervisor concern to conduct the monthly maintenance plan meeting? T/F
False
A typical duty of a supervisor is to inspect every task upon completion. T/F
False
operationally efficiency of a work center is dependent to a large extent upon what factor?
the arrangement of the work spaces and equipment
what type of maintenance is required by hours, calendar periods or starts?
Scheduled Maintenance
what is considered one of the best books for ensuring a smooth flow of maintenance info between shifts and other supervisors?
Daily maintenance meeting
What is the concept of quality assurance
prevention of the occurrence of defects
The achievement of effective quality assurance within a maintenance activity depends upon what factors?
Knowledge, special skills and prevention
a periodic or special evaluation of details, plans, and policies is known as an?
Audit
What determines the success or failure in achieving high standards of quality?
Frame of mind of all personnel
Completed check flight checklists are retained for what minimum period of time?
6 months or one phase cycle, whichever is greater
what factors determine the number of personnel assigned to a QA division?
Size of the unit and number of work shifts.
What is the time requirement before a QA stamp may be reassigned
3 months
Audits are maintained on file for what minimum period of time?
1 year
What work center is considered the “nerve center” of the intermediate maintenance activity?
Production Control
At a minimum, how often should an AWP validation be performed with the AWP uniting supply?
Weekly
What priority is assigned to the repair of salvaged material?
PRI 4
what priority is assigned to the repair of material for non mission capable aircraft?
PRI 1