Supply Flashcards
IMRL
Individual material readiness list
NALCOMIS
Naval aviation logistics command management Information system
Supply project code example
P9F
AK7
Organization
What code identifies the agent or agency that has design control over an item?
Cage
What section of the IPB contains general info and instructions for using the pub
Introduction
ICRL
Individual component repair list
13 digit number that identifies an item of material in the supply system
NSN
National stock number
what are the first 2 positions of SM and R code
the Source code
what are the 3rd and 4th position of the SM and R code
the Maintenance code
what is the 5th position of the SM and R code
the Recoverability code
which position in SM and R code has the lowest level authorized to R and R the item.
third
which position of SM and R code has the lowest level to completely repair an interview item
fourth
which position can BCM gear
fifth
Info from what source is used by supply department personnel as justification for stocking material
Usage statistics
Each IPB includes what 3 parts
Table of contents
Group assembly parts list
Numerical index
What section of the IPB contains an explanation of the source or SM and R codes
Introduction
What listing in the IPB lists aircraft assemblies and identifies the pages or figure numbers where are assemblies are shown in IPB
Alphabetical index
What section of the IPB contains a description of a component listed in the IPB
Alphabetical index
What section of the IPB lists supplementary handbooks to which you may refer
Introduction
What is the purpose of an index number in an IPB
Establish the relationship between parts in the illustration and the corresponding parts list.
An SM and R code is a 5-6 position alphanumeric code T/F
True
The reference number on a master cross-reference list refers to what number or numbers
Manufacturers part number,
Drawing number,
Design control number
Supply will remove an item from the PEB if there has been no demand for the item within what period of time?
12 months
What officer must approve the item of PEB stock age when it costs more than $150
The commanding officer
The SRS limits the quantity of any item in the pre-expended bin to a 30-day supply.
T/F
True
The IMRL contains how many major sections
5
What material condition code tells you that an item of supply is fast moving and in high demand?
F
At the Organizational maintenance level, the point of contact for all material requirements generated by a squadron is located in what organization
Material Control center