Test 12 Flashcards

1
Q

Most utility electrical power is produced by rotation generators that are mechanically driven.

A

True

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Interactive inverters act like a voltage source, while generators act like a current source.

A

False

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

The most common type of interactive PV system is one that does not use energy storage.

A

True

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

All utility-interactive inverters must be able to detect power outages and discontinue transfer of power until the utility system returns to normal operation.

A

True

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Three-phase inverter output can be achieved by using three smaller inverters and connecting each inverter to a different phase.

A

True

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

In dwellings, the sum of the ratings of the overcurrent protection devices feeding the busbar or conductor may be up to 150% of the rating of the panel or busbar.

A

False

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Electromechanical induction watt-hour meters are the most common type of meters installed by electric utility companies.

A

True

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Qualifying-facility agreements are intended for small interconnected PV systems.

A

False

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Liability insurance is required by most utilities that have interconnection standards.

A

True

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Every state has established rules regarding interconnection and metering.

A

False

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

_____ generation is a system in which many smaller power-generating systems create electrical power near the point of consumption.

A

Distributed

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

____ systems are interactive systems that include battery storage.

A

Bimodal

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

___ systems can be employed to manage and optimize utility energy use by utility customers that are billed using time-of-use rates.

A

Bimodal

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

In the United States, the technical requirements for PV systems are established through national codes and standards published by ____.

A

Institute of Electrical and Electronics Engineers (IEEE), Underwriters Laboratories (UL), and National Fire Protection Association (NFPA) (all of the above)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

Article 690 permits the output of interactive PV inverters to be connected to the ____ side or supply side of the service disconnect.

A

load

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

____ circuit breakers are circuit breakers on the load side of the main service disconnect that supple PV power to the busbar.

A

Back-feed

17
Q

The service conductors in a supply-side connection must be sized for at least ____% of the continuous load current, based on the PV system inverter maximum current output rating.

A

125

18
Q

____ metering records exported and imported electricity separately.

A

Dual

19
Q

A(n) ____ is a non-utility large-scale power producer that meets the technical and procedural requirements for interconnection to the utility system.

A

qualifying facility

20
Q

A(n) ____ agreement is a contract between a distributed power producer and an electric utility that establishes the terms and conditions for the interconnection.

A

interconnection

21
Q

____ is the process of connection a generator to an energized electrical system.

A

Synchronizing

22
Q

Inverter power output is limited by the capacity of the PV array, the inverter output rating, and ____.

A

temperature

23
Q

____ is the undesirable condition where an interactive inverter continues to transfer power to the utility grid during a utility outage.

A

Islanding

24
Q

Interconnection on the load side of the service disconnect is done through ____ circuit breakers.

A

back-feed

25
Q

A ____-side connection of interactive PV systems requires adding another service in parallel with an existing service disconnect.

A

supply

26
Q

____ metering uses one meter that can operate in both directions, effectively subtracting exported electricity from imported electricity.

A

Net

27
Q

____ cost is the cost that utility would normally incur to generate a given amount of power.

A

Avoided

28
Q

A(n) ____ is a contract between a utility and a qualifying facility that establishes the terms and conditions for interconnection and the rates or tariffs that apply.

A

qualifying-facility agreement

29
Q

____ rights allow the utility to check for listed equipment and proper installation before interconnection.

A

Inspection

30
Q

_____ agreements establish some means to credit the customer for excess power supplied to the utility.

A

Interconnection