Systems Test 1 Flashcards
- LOT 201.35 Non-Class DGs*
- *
When will the Non-Class DGs trip on overspeed?
- BOP / NTF / LTG:*
- *2073 RPM**
- ≈115% of 1800 RPM*
- TSC / Flex:*
- *1980 RPM**
- 110% of 1800 RPM*
- Note:*
- TSC DG also equiped with sequencer to prevent overloading TSC DG during S/U.*
- LOT 201.37 Class 1E 125VDC*
- *
What are some loads powered from the Class 1E 125VDC system?
Train A/B/C:
(A / B ONLY)
Rx Trip Breaker Control Power
PZR PORVs
ESF DGs:
Field Flash
Sequencers (A/B/C)
PL-139A/B/C (DG Control Panels)
ESF:
4.16 kV / 480V ESF Control Power
PL-39A/B/C (EAB)
Class 1E 120V Inverters
Train D:
- *Terry Turbine MOVs**
- *PL-40A (EAB)**
- *Class 1E 120V Inverter (1202)**
- LOT 201.21 Containment Isolation*
- *
What will cause a Phase A CIS?
SI
P-11 False:
PZR Pressure - Low (1857 psig) [2/4]
Steam Pressure - Low (735 psig) [2/3 on 1/4]
No Permissives:
Containment Pressure - High (3.0 psig) [2/3]
Manual [1/2] (CP001/CP005)
Manually [1/2] (CP002/CP005)
P-11 False: PZR Pressure ≥ 1985 psig [2/3]
Reset located on CP002.
- Note:*
- Will effect systems not safety related. (i.e IA to RCB)*
- LOT 201.31 13.8 kV / 4.16 kV Electrical*
- *
What are some major loads powered from the 1D Loadcenters?
RCB/MAB Chillers
OLACW Pumps
Low Pressure Heater Drip Pumps
- *BTRS Chiller**
- May or May not be abandoned*
- LOT 201.01 RCB*
- *
How many emergency sumps are in the RCB?
Three
Supplies LHSI, HHSI, and Containment Spray (CS)
- Note:*
- Located on RCB -11’ 3”*
- LOT 203.25 ICS*
- *
Which lampboxes are covered by tech specs?
Lampbox 5M03 D3 (AFD HI)
Lampbox 5M03 D5 (Rod Supv Mntr Rod Position TRBL)
- LOT 201.39 ESF DGs*
- *
What is the rated speed, power, and voltage of the ESF DGs?
600 RPM
- *5500 kW (Continuous)**
- 108% (83 days)*
- 110% (7 days)*
4.16 kV ± 10%
- Note:*
- ESF DGs will restore power to Class 1E buses in 10 secs following a LOOP.*
- LOT 202.33 RCB HVAC*
- *
How many Rx Containment Fan Coolers (RCFC) are required to be operating?
4 of 6 units
LCO 3.6.2.3 Containment Cooling
5 of 6 units OPERABLE
Keeps containment ≤ 110 ˚F during normal operation and during spray. (LCO 3.6.1.5 Containment Air Temperature)
- LOT 201.36 Class 1E 4.16kV/480V*
- *
What powers the RHR pumps, SFPC pumps, and the B/U PZR heaters?
- RHR:*
- *A: E1A2**
- *B: E1B2**
- *C: E1C1**
- SFPC:*
- *A: E1B1**
- *B: E1C1**
- PZR B/U Heaters:*
- *A: E1A1**
- *B: E1C1**
- LOT 201.23 Primary Sampling*
- *
What chemicals are added to the primary?
H2
pH w/ Φgamma and O2 control
Added to VCT
Hydrazine
pH w/o Φgamma and O2 control
Added to CVCS chemical mixing tank
LiOH
Minimizes corrosion and buildup of crud
Added to CVCS chemical mixing tank
- *Boric Acid**
- Added to CVCS Charging pump suction*
- LOT 203.25 ICS*
- *
Describe how U1118 measures feedwater flow if LEFM system is lost?
Switches to Corrected Venturi Input
AND
Starts 72 hr timer
Switches to Venturi Input when 72 hr timer expires
OR
> 10% drop in Rx power
Will bypass Corrected Venturi input and 72 hr timer
Power drop compares current Rx Power to captured LEFM Rx power
Correction Factors and Power level are captured when LEFM lost for Corrected Venturi Input.
Note:
Time Remaining changes from Cyan to Red when 6 hrs are remaining on clock.
- LOT 201.33 Non-Class DC*
- *
What is powered by 250 VDC Bus 1A?
TG Lube Oil EOP
Air Side Seal Oil Back-up Pump
SGFPT Emergency Oil Pumps
Generator Breaker Control Panel/Power
- LOT 201.33 Non-Class DC*
- *
What powers the 125 VDC bus 1A and 250 VDC bus 1A battery chargers?
MCC 1G1
MCC 1G5 (BOP DG)
- LOT 201.39 ESF DGs*
- *
What is the purpose of the reset and release pushbuttons on CP003?
- Reset:*
- *Resets all Normal DG Trips**
- Release:*
- *Switches DG from Emergency Mode → Normal Mode**
- Switches from Isoch Mode → Parallel Mode*
Must press Reset button, verify master trip circuit reset light illuminated, and then release ESF DG from Emergency Mode. (DG will trip if not done)
Note:
- If Normal Trip was received in Emergency Mode, DG will stop immediately once Stop pushbutton pressed. (No 5 min C/D)
- This will occur even if Reset pushbutton pressed.
- LOT 201.33 Non-Class DC*
- *
How long will the Non-Class 1E batteries last on a loss of battery charger power?
2 hrs
Will fully recharge in 12 hrs
- Note:*
- Class 1E batteries will last 4 hrs.*
- LOT 201.21 Containment Isolation*
- *
What causes a containment ventilation isolation (CVI) signal?
- No Permissives:*
- *SI**
- *Radiation - High (RT8012/RT8013) [1/2]**
- Manual:*
- *Containment Phase A [1/2]**
- (CP002/CP005)*
- *Containment Phase B [2/2 on 1/2]**
- (CP002/CP005)*
Reset located on CP022.
- Note:*
- Isolates Containment Normal and Supplemental Purge Systems and Containment Airborne Activity Monitor (RT-8011)*
- LOT 201.37 Class 1E 125VDC*
- *
What powers the Class 1E 125VDC Buses (E1A11/E1B11/E1C11/E1D11)?
- Channel I:*
- *E1A11: E1A1 / E1A2**
- Channel II:*
- *E1D11: E1A4 / E1A1**
- Channel III:*
- *E1B11: E1B1 / E1B2**
- Channel IV:*
- *E1C11: E1C1 / E1C2**
1 2 4 1 1 2 1 2
- LOT 201.36 Class 1E 4.16kV/480V*
- *
Which XFMR(s) have an automatic load tap changer?
- *UATs**
- Located on CP010*
B ESF XFMRs
Located on CP003
B Class 1E buses receive power from standby XFMR which doesn’t have load changer
As Switchyard voltage lowers, load changer will adjust XFMR tap to raise bus voltage back up.
Will recover bus voltage to >3920 Volts within 35 seconds from a minimum switchyard voltage of 327.8 kV
- LOT 201.01 RCB*
- *
What is the design pressure of containment?
- Internal:*
- *56.5 psig**
- Between -0.1 and +0.3 psig*
- CNMT PRESS HI / LOW (CP002)*
- (LCO 3.6.1.4 Containment Internal Pressure)*
- External:*
- *3.5 psig**
Max expected for DBA is 41.2 psig
CNMT PRESS HI/LOW on CP002 will put you in LCO 3.6.1.4 Containment Internal Pressure.
- Note:*
- Design temperature is 286 ˚F*
- LOT 201.30 Offsite Electrical*
- *
Which 13.8 kV switchgears are normally powered from the standby transformers while at power?
1G STBY Bus
2G STBY Bus
Loss of North Bus starts SDG 12
Loss of South Bus starts SDG 22
- LOT 201.33 Non-Class DC*
- *
What powers the 48 VDC Battery Chargers?
MCC 1K2
MCC 1G8 (TSC DG)
- LOT 201.39 ESF DGs*
- *
What is the minimum level required in each ESF DG fuel oil storage tank?
60,500 gallons
LCO 3.8.1.1 AC Sources - Operating
LCO 3.8.1.2 AC Sources - S/D
LCO 3.8.1.3 AC Sources - S/D
Capacity: 70,000 gallons
- Note:*
- Will last for 7 days (≥ 60,500 gallons)*
- LOT 201.32 Non-Class 480V*
- *
What provides control power to load centers?
125 VDC Control Power
MCCs provide their own control power.
- LOT 201.33 Non-Class DC*
- *
What powers the 125VDC Bus 1B Battery Chargers?
MCC 1A5
MCC 1G8 (TSC DG)
- LOT 201.34 Non-Class 1E Vital 120 VAC*
- *
What powers the 25 kVA 120V UPS panels (DP005/DP006)?
- Normal (Inverter):*
- *125VDC Bus 1B**
- Alternate (VRT):*
- *MCC 1J1 (DP005)**
- *MCC 1J2 (DP006)**
Note:
Unlike 20 kVA 120V UPS panels, the 25 kVA 120V UPS panels do NOT contain a rectifier.
- LOT 201.01 RCB*
- *
What is the containment average air temperature limit as required in LCO 3.6.1.5 Contaiment Air Temperature?
≤ 110 ˚F
Determined by looking at running RCFC inlet temperatures.