SUPPLY LAYS Flashcards
Race for water
Engine is within 150 feet of a hydrant
No lay required
Supply lays
Forward supply-hydrant to the fire Reverse lay Split lay Dual supply Tandem supply
Forward lay
First in engine lays from hydrant to the fire
Hydrant is adequate second in engine is delayed
Hydrant unsupported
First engine forward lay second engine pumps hydrant
Typical set up
Estimations on capability of supply lays
Single 3" supply 500 GPM Single 4" supply 1000 GPM Dual supply 1500 GPM Tandem supply 500 GPM Split lay 1000 GPM
Friction loss per hundred feet
3 inch at 500 GPM 18 PSI per 100’
4 inch supply at 1000 GPM 15 psi per 100’
4 inch supply at 500 GPM 4 PSI per 100’
Dual supply at 1500 GPM 16 PSI per 100’
Typical residual pressure from hydrant
50 to 100 psi
Typically not capable of providing 500 GPM through 200 to 300 feet of hose without supporting the 4 way
Establishing a water supply
Attack engine laid supply lines- tell supply engine PDP
Supply engine laid supply lines- tell supply engine anticipated GPM
Supporting unknown flows:
3” 100 psi
4” 50 psi